HP 6125XLG R2306-HP 6125XLG Blade Switch High Availability Configuration Guide - Page 117

Static routing-Track-NQA collaboration configuration example, Network requirements, Switch

Page 117 highlights

Total number of virtual routers : 1 Interface Vlan-interface2 VRID : 1 Admin Status : Up Config Pri : 100 Preempt Mode : Yes Auth Type : None Virtual IP : 192.168.0.10 Virtual MAC : 0000-5e00-0101 Master IP : 192.168.0.102 Adver Timer State Running Pri Delay Time : 100 : Master : 100 : 0 The output shows that when Switch A detects that the uplink fails through BFD, it decreases its priority by 20 to make sure that Switch B can preempt as the master. Static routing-Track-NQA collaboration configuration example Network requirements As shown in Figure 30, Switch A, Switch B, Switch C, and Switch D are connected to two segments 20.1.1.0/24 and 30.1.1.0/24. Configure static routes on these switches so that the two segments can communicate with each other. Configure route backup to improve network reliability. Switch A is the default gateway of the hosts in segment 20.1.1.0/24. Two static routes to 30.1.1.0/24 exist on Switch A, with the next hop being Switch B and Switch C, respectively. These two static routes back up each other as follows: • The static route with Switch B as the next hop has a higher priority, and is the master route. If this route is available, Switch A forwards packets to 30.1.1.0/24 through Switch B. • The static route with Switch C as the next hop acts as the backup route. • Configure static routing-Track-NQA collaboration to determine whether the master route is available in real time. If the master route is unavailable, the backup route takes effect, and Switch A forwards packets to 30.1.1.0/24 through Switch C. Similarly, Switch D is the default gateway of the hosts in segment 30.1.1.0/24. Two static routes to 20.1.1.0/24 exist on Switch D, with the next hop being Switch B and Switch C, respectively. These two static routes back up each other as follows: • The static route with Switch B as the next hop has a higher priority, and is the master route. If this route is available, Switch D forwards packets to 20.1.1.0/24 through Switch B. • The static route with Switch C as the next hop acts as the backup route. • Configure static routing-Track-NQA collaboration to determine whether the master route is available in real time. If the master route is unavailable, the backup route takes effect, and Switch D forwards packets to 20.1.1.0/24 through Switch C. 112

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144

112
Total number of virtual routers : 1
Interface Vlan-interface2
VRID
: 1
Adver Timer
: 100
Admin Status
: Up
State
: Master
Config Pri
: 100
Running Pri
: 100
Preempt Mode
: Yes
Delay Time
: 0
Auth Type
: None
Virtual IP
: 192.168.0.10
Virtual MAC
: 0000-5e00-0101
Master IP
: 192.168.0.102
The output shows that when Switch A detects that the uplink fails through BFD, it decreases its priority by
20 to make sure that Switch B can preempt as the master.
Static routing-Track-NQA collaboration configuration example
Network requirements
As shown in
Figure 30
, Switch A, Switch B, Switch C, and Switch D are connected to two segments
20.1.1.0/24 and 30.1.1.0/24. Configure static routes on these switches so that the two segments can
communicate with each other. Configure route backup to improve network reliability.
Switch A is the default gateway of the hosts in segment 20.1.1.0/24. Two static routes to 30.1.1.0/24 exist
on Switch A, with the next hop being Switch B and Switch C, respectively. These two static routes back
up each other as follows:
The static route with Switch B as the next hop has a higher priority, and is the master route. If this
route is available, Switch A forwards packets to 30.1.1.0/24 through Switch B.
The static route with Switch C as the next hop acts as the backup route.
Configure static routing-Track-NQA collaboration to determine whether the master route is
available in real time. If the master route is unavailable, the backup route takes effect, and Switch
A forwards packets to 30.1.1.0/24 through Switch C.
Similarly, Switch D is the default gateway of the hosts in segment 30.1.1.0/24. Two static routes to
20.1.1.0/24 exist on Switch D, with the next hop being Switch B and Switch C, respectively. These two
static routes back up each other as follows:
The static route with Switch B as the next hop has a higher priority, and is the master route. If this
route is available, Switch D forwards packets to 20.1.1.0/24 through Switch B.
The static route with Switch C as the next hop acts as the backup route.
Configure static routing-Track-NQA collaboration to determine whether the master route is
available in real time. If the master route is unavailable, the backup route takes effect, and Switch
D forwards packets to 20.1.1.0/24 through Switch C.