IBM 4247-003 Maintenance Manual - Page 88
MAP 0100: START OF CALL on, Install the ASF bin assembly.
View all IBM 4247-003 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 88 highlights
Table 11. MAP 0150: Power Supply (continued) Questions/Actions 22. a. Power off (O) the printer. b. Install the stacker assembly. c. Power on (|) the printer. Does the power supply fan run OK? 23. 1. Power off (O) the printer. 2. Install the ASF bin assembly. 3. Power on (|) the printer. Does the power supply fan run OK? Yes No Go to step 23. Power off (O) the printer. Install a new stacker assembly. Run T&D in automatic mode to verify correct printer operation. For Model A00, see "How To Run the Test and Diagnostic (T&D) Programs" on page 161. For Models 001, 002, or 003, see "How To Run the Test and Diagnostic (T&D) Programs" on page 201. Verify the failure symptom, and Power off (O) the printer. return to step 2 on page 23 in "MAP 0100: START OF CALL" on Install a new ASF bin assembly. page 23. If bin 2 & 3 ar epresent, isolate by disconnecting inside the electronics card cover on bin 1. Run T&D in automatic mode to verify correct printer operation. For Model A00, see "How To Run the Test and Diagnostic (T&D) Programs" on page 161. For Models 001, 002, or 003, see "How To Run the Test and Diagnostic (T&D) Programs" on page 201. Chapter 1. Diagnosing Problems 88