1 Rack chassis 2 Top trim panel 3 Left-side trim panel 4 Right-side trim panel 5 Spring clip Figure 4. Removing the trim panels 3. If they are installed, remove the front and rear doors. After the rack doors have been removed, go to the next substep. To remove a rack door, complete the following steps: a. Unlock and open the door. b. Grasp the door firmly with both hands and pull it away from the hinges. 4. Locate the hardware mounting kit and the two mounting plates. Refer to the following illustration when reviewing the contents of the hardware mounting kit. The hardware mounting kit contains the following items: v 4 Rack-mounting bolts v 4 Thin washers v 8 Plastic isolator bushings v 4 Thick washers v 4 Spacers 5. If you are installing an ac-powered rack, temporarily install the lower plastic isolator bushings to help you locate the mounting locations for the stabilizer bracket. After the stabilizer bracket has been Racks and rack features 5

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74

1
Rack chassis
4
Right-side trim panel
2
Top trim panel
5
Spring clip
3
Left-side trim panel
3.
If they are installed, remove the front and rear doors. After the rack doors have been removed, go to
the next substep. To remove a rack door, complete the following steps:
a.
Unlock and open the door.
b.
Grasp the door firmly with both hands and pull it away from the hinges.
4.
Locate the hardware mounting kit and the two mounting plates. Refer to the following illustration
when reviewing the contents of the hardware mounting kit. The hardware mounting kit contains the
following items:
v
4 Rack-mounting bolts
v
4 Thin washers
v
8 Plastic isolator bushings
v
4 Thick washers
v
4 Spacers
5.
If you are installing an ac-powered rack, temporarily install the lower plastic isolator bushings to
help you locate the mounting locations for the stabilizer bracket. After the stabilizer bracket has been
Figure 4. Removing the trim panels
Racks and rack features
5