IBM 7014-T42 User Guide - Page 55
Identify an open mounting space that is the size of a single EIA in the rack where you will install
View all IBM 7014-T42 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 55 highlights
Figure 42. Aligning the vertical-mounting brackets to the front of the PDU+ 4. Attach the brackets (A) to the PDU+ with two M3x5 screws (B) per bracket. Use screws that were provided with the rack mounting kit. 5. Align the long mounting brackets (A) with the holes in the rear of the PDU model, and attach the brackets to the PDU model with two M3 pan-head screws (B) with captive lock washers per bracket. Use screws that were provided with the rack mounting kit. Figure 43. Attaching the long mounting brackets 6. Identify an open mounting space that is the size of a single EIA in the rack where you will install the PDU model. At the front of the rack, attach an M6 screw to the middle hole of the EIA on each side of the rack. At the rear of the rack, attach nut clips to the top and bottom holes of the EIA on each side of the rack. Use nut clips that were provided with the rack mounting kit. Racks and rack features 43