Sharp NP-PH3501QL Installation Manual - NEC - Page 50
Connecting the power cable (English), 1-8-1. Power supply construction specifications
View all Sharp NP-PH3501QL manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 50 highlights
1. Before Setting Up Your Projector 1-8. Connecting the power cable (English) Connect the power cable of the projector. The AC power cable is not attached as an accessory. Be sure to have professional technicians do any power supply construction. WARNING Carefully read the contents described in this section before connection and connect the cables according to the proper procedure. Inappropriate handling may cause fatal, serious or other bodily injuries due to fire or electric shock. CAUTION • Make sure that the AC power supply is disconnected before carrying out the work of connecting the power supply cable. • Be sure to follow the contents described in this section. • Entrust a specialist to carry out the power supply work from the power supply equipment of the building to the place of projector installation. • Be sure to ground the equipment to ensure safety. To avoid electric shock, request a professional to carry out the grounding and related works. Make sure to ground the equipment before supply of the AC power. 1-8-1. Power supply construction specifications There are two different ways to connect the power cables, the C1 connection and the C2 connection. • C1 connection AC power is provided to the projector power supply and the light power supply by a single cable. C1 connection AC power supply equipment Breaker AC power supply cable Input Selection Projector (Main unit) Light power supply unit 24