Dell Unity XT 480 Unity All Flash and Unity Hybrid Unity 480/F Unity 680/F Uni - Page 13
Secure the system in the cabinet, Attach the storage processors to the network, Install optional
View all Dell Unity XT 480 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 13 highlights
Secure the system in the cabinet Steps If securing the system for shipment in the cabinet or in other unstable environments, locate the hard mount captive screw under each latch and tighten using a #1 Phillips screwdriver. Figure 4. Securing the system in the cabinet Attach the storage processors to the network Steps 1. Locate two bulk Category (CAT) 5, 5e, 6, 6a or better Ethernet cables. 2. Connect two Ethernet cables from the LAN to the 1 Gb RJ45 management ports from which you will configure the system. This will be one port on each storage processor. NOTE: The SP A and SP B network management ports must be connected on the same subnet. In general, both SPs should have mirrored configurations in order to provide failover. Figure 5. Cabling the storage processors to the network NOTE: Once the management cables are plugged into each SP, do not remove them unless instructed to do so by Service, or in order to perform maintenance on the system as instructed by the maintenance procedure. NOTE: Additional information about the ports and cabling is in the Hardware Information Guide, available on the Unity Info Hub at https://www.dell.com/unitydocs or on Online Support (https://www.dell.com/support). Install optional DAEs If you are installing one or more optional DAEs, see Unpack the (optional) disk-array enclosures for installation instructions. Installation Procedures 13