HP ProLiant 4500 Compaq ProLiant 4500R Rack-Mountable Servers Maintenance and - Page 22

Boards, Hot-Pluggable Drive Backplane Board

Page 22 highlights

2-10 Removal and Replacement Procedures Boards This section will describe how to remove and replace the Hot-Pluggable hard drive backplane board, memory modules, processor and option boards. Hot-Pluggable Drive Backplane Board Figure 2-9. Removing the Backplane Board 1. Label and remove all hard drives. CAUTION: Be sure to label the drives before removing so that they can be replaced in their original positions. Failure to do so will result in permanent data loss. 2. Extend the server out from the rack to the locked position. 3. Remove cover plate. 4. Remove Y brace. 5. Extend sub panel back. 6. Label and remove signal cables. 7. Remove retaining screws (10). 8. Remove board. 9. Reverse steps for installation. Maintenance and Service Guide

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92

2-10
Removal and Replacement Procedures
Maintenance and Service Guide
Boards
This section will describe how to remove and replace the Hot-Pluggable hard drive backplane
board, memory modules, processor and option boards.
Hot-Pluggable Drive Backplane Board
Figure 2-9.
Removing the Backplane Board
1.
Label and remove all hard drives.
CAUTION:
Be sure to label the drives before removing so that they can be
replaced in their original positions.
Failure to do so will result in permanent
data loss.
2.
Extend the server out from the rack to the locked position.
3.
Remove cover plate.
4.
Remove Y brace.
5.
Extend sub panel back.
6.
Label and remove signal cables.
7.
Remove retaining screws (10).
8.
Remove board.
9.
Reverse steps for installation.