HP ProLiant 4500 Compaq ProLiant 4500R Rack-Mountable Servers Maintenance and - Page 25

Processor and Option Boards

Page 25 highlights

Processor and Option Boards Removal and Replacement Procedures 2-13 Figure 2-11. Removing the Processor and Option Boards To Replace Option Board 1. Extend server from the rack to the locked position. 2. Remove cover plate. 3. Remove Y brace. 4. Remove any cables connected to the option board. 5. Remove retaining screw and pull board straight out. 6. Reverse steps for option board installation. To Replace Processor Board 1. Extend server from the rack to the locked position. 2. Remove cover plate. 3. Remove Y brace and card bracket. 5. Pull board straight out. 6. Reverse steps for processor board installation. Maintenance and Service Guide

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92

Removal and Replacement Procedures
2-13
Maintenance and Service Guide
Processor and Option Boards
Figure 2-11.
Removing the Processor and Option Boards
To Replace Option Board
1.
Extend server from the rack to the locked position.
2.
Remove cover plate.
3.
Remove Y brace.
4.
Remove any cables connected to the option board.
5.
Remove retaining screw and pull board straight out.
6.
Reverse steps for option board installation.
To Replace Processor Board
1.
Extend server from the rack to the locked position.
2.
Remove cover plate.
3.
Remove Y brace and card bracket.
5.
Pull board straight out.
6.
Reverse steps for processor board installation.