3Com 3C780 User Guide - Page 21

Road Map to Hub Operations

Page 21 highlights

Quick Start Quick Start 1 Use this Quick Start procedure if: s You are experienced in installing and operating LinkBuilder FDDI hubs. s You have an FDDI segment running with other network devices attached to it. Road Map to Hub Operations The steps listed below summarize the procedures needed to make the 3Com® LinkBuilder® FDDI Workgroup Hub operational. The list also shows where each step is discussed in this user guide. 1. Unpacking the hub and modules - Quick Start - Chapter 2: "Unpacking the Hub"; "Installing Modules" 2. Installing the modules - Quick Start - Chapter 2: "Installing Modules" 3. Connecting a terminal - Chapter 2: "Accessing the Hub" 4. Determining legal port connections - Chapter 2: "Planning Connections" - Chapter 3: "Attachment Options"; "Port Connections" 5. Attaching the hub to the ring - Chapter 2: "Connecting to the Dual Ring" 6. Attaching other devices to the hub - Chapter 2: "Data Flow Specifications"

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172
  • 173
  • 174
  • 175
  • 176

Quick Start
Use this Quick Start procedure if:
You are experienced in installing and operating LinkBuilder FDDI hubs.
You have an FDDI segment running with other network devices attached
to it.
Road Map to Hub Operations
The steps listed below summarize the procedures needed to make the 3Com
®
LinkBuilder
®
FDDI Workgroup Hub operational.
The list also shows where
each step is discussed in this user guide.
1.
Unpacking the hub and modules
Quick Start
Chapter 2: “Unpacking the Hub”; “Installing Modules”
2.
Installing the modules
Quick Start
Chapter 2: “Installing Modules”
3.
Connecting a terminal
Chapter 2: “Accessing the Hub”
4.
Determining legal port connections
Chapter 2: “Planning Connections”
Chapter 3: “Attachment Options”; “Port Connections”
5.
Attaching the hub to the ring
Chapter 2: “Connecting to the Dual Ring”
6.
Attaching other devices to the hub
Chapter 2: “Data Flow Specifications”