3Com 3C780 User Guide - Page 41

Installing the Hub

Page 41 highlights

Installing the Hub 2-1 Chapter 2 Installing the Hub This chapter describes installation of the LinkBuilder FDDI Workgroup Hub. It includes the following topics: s Unpacking the hub s Rack mounting the hub s Equipping the hub s Installing and removing modules s Accessing the hub s Understanding data flow s Installing an optional optical bypass switch NOTE: For a step-by-step procedure for installing the hub and preparing it for network operations, see the Quick Start chapter at the beginning of this guide. Unpacking the Hub To unpack the hub, follow these steps: 1. Open the shipping container and carefully remove its contents. 2. Return all packing materials to the shipping container and save it. If the hub must be returned, ship it in its original shipping container (or one providing equivalent protection), or the warranty will be voided. 3. Verify that you have received all items on the packing list, and inspect each item for damage. If you find any omissions or damage, contact your network supplier and the carrier that delivered the package.

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172
  • 173
  • 174
  • 175
  • 176

Chapter 2
Installing the Hub
This chapter describes installation of the LinkBuilder FDDI Workgroup Hub.
It
includes the following topics:
Unpacking the hub
Rack mounting the hub
Equipping the hub
Installing and removing modules
Accessing the hub
Understanding data flow
Installing an optional optical bypass switch
NOTE:
For a step-by-step procedure for installing the hub and preparing it for
network operations, see the Quick Start chapter at the beginning of this guide.
Unpacking the Hub
To unpack the hub, follow these steps:
1.
Open the shipping container and carefully remove its contents.
2.
Return all packing materials to the shipping container and save it.
If the hub must be returned, ship it in its original shipping container (or one
providing equivalent protection), or the warranty will be voided.
3.
Verify that you have received all items on the packing list, and inspect
each item for damage.
If you find any omissions or damage, contact your network supplier and
the carrier that delivered the package.