3Com 3C780 User Guide - Page 41
Installing the Hub
UPC - 662705029917
View all 3Com 3C780 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 41 highlights
Installing the Hub 2-1 Chapter 2 Installing the Hub This chapter describes installation of the LinkBuilder FDDI Workgroup Hub. It includes the following topics: s Unpacking the hub s Rack mounting the hub s Equipping the hub s Installing and removing modules s Accessing the hub s Understanding data flow s Installing an optional optical bypass switch NOTE: For a step-by-step procedure for installing the hub and preparing it for network operations, see the Quick Start chapter at the beginning of this guide. Unpacking the Hub To unpack the hub, follow these steps: 1. Open the shipping container and carefully remove its contents. 2. Return all packing materials to the shipping container and save it. If the hub must be returned, ship it in its original shipping container (or one providing equivalent protection), or the warranty will be voided. 3. Verify that you have received all items on the packing list, and inspect each item for damage. If you find any omissions or damage, contact your network supplier and the carrier that delivered the package.