Cisco 7600 SIP 200 Hardware Installation Guide - Page 139

Installing and Removing a SIP, Handling SIPs

Page 139 highlights

5 C H A P T E R Installing and Removing a SIP This chapter describes how to install or remove SIPs on the Cisco 7600 series routers. This chapter contains the following sections: • Handling SIPs, page 5-1 • Online Insertion and Removal, page 5-2 • SIP Installation and Removal, page 5-8 Handling SIPs Each SIP circuit board is mounted to a metal carrier and is sensitive to electrostatic discharge (ESD) damage. Before you begin installation, read Chapter 4, "Preparing to Install a SIP or a Shared Port Adapter," for a list of parts and tools required for installation. Caution Always handle the SIP by the carrier edges and handle; never touch the SIP components or connector pins. (See Figure 5-1.) When a slot is not in use, a blank filler plate must be installed in the empty slot to allow the router or switch to conform to electromagnetic interference (EMI) emissions requirements and to allow proper airflow across the installed modules. If you plan to install a SIP in a slot that is not in use, you must first remove the blank filler plate. OL-5052-14 Cisco 7600 Series Router SIP, SSC, and SPA Hardware Installation Guide 5-1

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172

CHAPTER
5-1
Cisco 7600 Series Router SIP, SSC, and SPA Hardware Installation Guide
OL-5052-14
5
Installing and Removing a SIP
This chapter describes how to install or remove SIPs on the Cisco 7600 series routers. This chapter
contains the following sections:
Handling SIPs, page 5-1
Online Insertion and Removal, page 5-2
SIP Installation and Removal, page 5-8
Handling SIPs
Each SIP circuit board is mounted to a metal carrier and is sensitive to electrostatic discharge (ESD)
damage. Before you begin installation, read
Chapter 4, “Preparing to Install a SIP or a Shared Port
Adapter,”
for a list of parts and tools required for installation.
Caution
Always handle the SIP by the carrier edges and handle; never touch the SIP components or connector
pins. (See
Figure 5-1
.)
When a slot is not in use, a blank filler plate must be installed in the empty slot to allow the router or
switch to conform to electromagnetic interference (EMI) emissions requirements and to allow proper
airflow across the installed modules. If you plan to install a SIP in a slot that is not in use, you must first
remove the blank filler plate.