HP ProLiant 2500 Compaq ProLiant 2500 Servers Installation Guide - Page 83
Align the other end of the cable management arm on the outside of the, shown in the following
![]() |
View all HP ProLiant 2500 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 83 highlights
4-24 Overview of Installing ProLiant 2500R Server and Hardware Options 1. For easier handling, first slide the server into the rack, then attach the cable management arm to the cable management arm bracket. If you attach the arm before loading the server in the rack, the arm may swing around and interfere with the loading process. 2. After you have loaded the server into the rack, attach one end of the cable management arm to the server's cable management arm bracket using two M6 x 1.0-12L Phillips screws. Align the arm to the bracket as shown in the following figure. CZR4-016.EPS Figure 4-16. Attaching the cable management arm to the cable management arm bracket 3. Align the other end of the cable management arm on the outside of the rear brace of the rack. Align a screw retaining plate on the inside of the rack. Attach the arm to the rack with two 10-32 x 5/8-inch Phillips washer-face hex-head screws.
![](/manual_guide/products/hewlettpackard-proliant-2500-compaq-proliant-2500-servers-installation-guide-6355284/83.png)