IBM 3580-L23 Setup Guide - Page 22
Step 2. Using the Inventory Checklist, Step 3. Installing the Rackmount Kit - scsi terminator
View all IBM 3580-L23 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 22 highlights
Step 2. Using the Inventory Checklist Ensure that you have received the following items: __ 1. Power cord (for the appropriate cord for your country or region, see Appendix F, "Power Cords", on page 105) __ 2. IBM LTO Ultrium Data Cartridge __ 3. IBM TotalStorage LTO Ultrium Cleaning Cartridge __ 4. Single-connector SCSI wrap tool __ 5. Device driver kit that includes: v CD that contains the device drivers, the IBM Ultrium Device Drivers Installation and User's Guide, and the IBM Ultrium Device Drivers Programming Reference __ 6. A host-to-device SCSI bus (signal) cable and a terminator __ 7. Optional rackmount kit (if ordered) __ 8. The IBM TotalStorage Ultrium Tape Drive 3580 Models L23 and H23 Quick Reference, GX35-5068 __ 9. The IBM TotalStorage Ultrium Tape Drive 3580 Models L23 and H23 Setup and Operator Guide, GA32-0460 (this guide) __ 10. The IBM Externally Attached Devices Safety Information manual Step 3. Installing the Rackmount Kit If you ordered the optional rackmount kit, refer to Appendix D, "Installing a Tape Drive into a Rack", on page 97 for installation instructions. If you did not order the optional rackmount kit, proceed to "Step 4. Inspecting the Power Cord and Outlet". Step 4. Inspecting the Power Cord and Outlet __ 1. Inspect the power cord plug to ensure that it matches the power receptacle. If it does not match, see Appendix F, "Power Cords", on page 105 to determine the appropriate power cord. __ 2. Ensure that the electrical outlets that you use are properly grounded and that the circuit breaker is turned on. 6 IBM 3580 Ultrium Tape Drive Setup and Operator Guide