IBM 689912U Hardware Maintenance Manual - Page 229
Stopping the Tests, Running an Individual Test
View all IBM 689912U manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 229 highlights
Note: Pressing the first letter of a test does not activate the test, unlike menu operation. 5. Press Enter. Running an Individual Test To run an individual test: 1. Use the up and down arrow keys (↑ and ↓) to move to the highlighted bar to the test you want to run. 2. Press Enter to run the test. Note: The results of the test appear in the lower-right-hand Test Log window. Also, if you enabled Test Logging, the results are recorded in the Test Log. 3. When the test completes, press Esc to return to the Test Group Menu. Stopping the Tests To stop running a specific test or stop testing after you have started a test, press Esc while the test is running. The test pauses at the first possible opportunity, and the Skip/Abort Test Menu appears with the following options: Option Continue Skip to next test Skip to next group Abort all tests Action The test program begins testing where it left off. The test program skips the current test, but remaining tests for the selected Test Module continue. The test program skips the remaining tests in the current test group. The test program stops and returns to the previous menu. Reference Information 219