Cisco 4948 Installation Guide - Page 43

Installing the Switch, Preparing to Install the Chassis - switch configuration guide

Page 43 highlights

3 C H A P T E R Installing the Switch Revised: January 4, 2012 This chapter describes how to install the Catalyst 4948E switch in an equipment rack. • Preparing to Install the Chassis, page 3-1 • Rack-Mounting the Chassis, page 3-5 • Installing the System Ground, page 3-10 • Connecting Power to the Switch, page 3-12 • Attaching the Interface Cables, page 3-15 • Powering Up the Switch, page 3-21 Note Before starting the installation procedures in this chapter, complete the site planning checklist in Chapter 2, "Preparing for Installation" to verify that all planning activities were completed. Preparing to Install the Chassis This section covers these topics: • Warnings, page 3-2 • Verifying Package Contents, page 3-4 • Required Tools, page 3-4 • Lifting the Chassis Safely, page 3-5 Tip For additional information about the Cisco Catalyst 4948E and the Catalyst 4948E-F switches (including configuration examples and troubleshooting information), see the documents listed on this page: http://www.cisco.com/en/US/products/ps6021/tsd_products_support_series_home.html OL-21561-02 Catalyst 4948E and Catalyst 4948E-F Switch Installation Guide 3-1

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162

CHAPTER
3-1
Catalyst 4948E and Catalyst 4948E-F Switch Installation Guide
OL-21561-02
3
Installing the Switch
Revised: January 4, 2012
This chapter describes how to install the Catalyst 4948E switch in an equipment rack.
Preparing to Install the Chassis, page 3-1
Rack-Mounting the Chassis, page 3-5
Installing the System Ground, page 3-10
Connecting Power to the Switch, page 3-12
Attaching the Interface Cables, page 3-15
Powering Up the Switch, page 3-21
Note
Before starting the installation procedures in this chapter, complete the site planning checklist in
Chapter 2, “Preparing for Installation”
to verify that all planning activities were completed.
Preparing to Install the Chassis
This section covers these topics:
Warnings, page 3-2
Verifying Package Contents, page 3-4
Required Tools, page 3-4
Lifting the Chassis Safely, page 3-5
Tip
For additional information about the Cisco Catalyst 4948E and the Catalyst 4948E-F switches (including
configuration examples and troubleshooting information), see the documents listed on this page: