Dell PowerEdge R940 EMC Installation and Service Manual - Page 125

Removing expansion card riser blank

Page 125 highlights

Table 52. Expansion card installation order - Four processor configuration (continued) Card type Slot priority Maximum number of cards 100 GB NIC dual port (Mellanox) 11, 8, 3, 4, 12, 9, 2, 10, 13, 7 4 100 GB OPA x16 (Intel) 2, 4, 8, 11, 3, 7, 9, 12, 10, 13 10 External adapter (12 Gbps HBA, H840, 5, 1, 6, 8, 11, 2, 4, 9, 12, 3, 7, 10, 13 2 H830) NVMe PCIe storage (Samsung) 5, 1, 6, 8, 11, 2, 4, 9, 12, 3, 7, 10, 13 13 40Gb NIC x8 (Intel) 5, 1, 6, 8, 11, 2, 4, 9, 12, 3, 7, 10, 13 13 40Gb NIC x8 (Mellanox) 11, 8, 3, 4, 12, 9, 2, 10, 13, 7, 6, 1, 5 8 FC32 HBA (Emulex and QLogic FC16) 5, 1, 6, 8, 11, 2, 4, 9, 12, 3, 7, 10, 13 13 FC32 HBA x8 (Emulex and QLogic FC16) 5, 1, 6, 8, 11, 2, 4, 9, 12, 3, 7, 10, 13 13 25 GB NIC (Broadcom) 5, 1, 6, 8, 11, 2, 4, 9, 12, 3, 7, 10, 13 13 25 GB NIC (Mellanox) 11, 8, 3, 4, 12, 9, 2, 10, 13, 7, 6, 1, 5 8 25 GB NIC x8 (QLogic FC16) 5, 1, 6, 8, 11, 2, 4, 9, 12, 3, 7, 10, 13 13 FC16 HBA (Emulex and QLogic FC16) 5, 1, 6, 8, 11, 2, 4, 9, 12, 3, 7, 10, 13 13 FC8 HBA (Emulex and QLogic FC16) 5, 1, 6, 8, 11, 2, 4, 9, 12, 3, 7, 10, 13 13 1 GB NIC (Broadcom and Intel) 5, 1, 6, 11, 2, 4, 9, 12, 3, 10, 13 11 10 GB NIC dual port (SolarFlare) 5, 1, 6, 8, 11, 2, 4, 9, 12, 3, 7, 10, 13 13 10 GB NIC dual port (Intel, QLogic FC16, 5, 1, 6, 11, 2, 4, 9, 12, 3, 10, 13 11 Broadcom) 10 GB NIC SFP SFP+ dual port (QLogic 5, 1, 6, 8, 11, 2, 4, 9, 12, 3, 7, 10, 13 13 FC16) 10 GB NIC SFP+ dual port (Mellanox) 11, 8, 3, 4, 12, 9, 2, 10, 13, 7, 6, 1, 5 8 10 GB NIC dual port (Broadcom) 5, 1, 6, 8, 11, 2, 4, 9, 12, 3, 7, 10, 13 13 10 GB NIC SFP+ (Intel) 5, 1, 6, 8, 11, 2, 4, 9, 12, 3, 7, 10, 13 13 10 GB NIC Quad port (Intel) 11, 10, 2, 4 4 PERC 9 : Internal Adapter 1,6 2 PCIe Extender 11,12,8 3 PERC 9 : External Adapter 5,1,6,8,11,2,4,9,12,3,7,10,13 2 Removing expansion card riser blank Prerequisites 1. Follow the safety guidelines listed in Safety instructions on page 65. 2. Follow the procedure listed in Before working inside your system on page 66. Steps Hold the expansion card riser blank and lift the blank out of the system. NOTE: When you upgrade your system from two processor configuration to four processor, ensure that you remove the riser blanks from the system. Installing and removing system components 125

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171

Table 52. Expansion card installation order — Four processor configuration (continued)
Card type
Slot priority
Maximum number of cards
100 GB NIC dual port (Mellanox)
11, 8, 3, 4, 12, 9, 2, 10, 13, 7
4
100 GB OPA x16 (Intel)
2, 4, 8, 11, 3, 7, 9, 12, 10, 13
10
External adapter (12 Gbps HBA, H840,
H830)
5, 1, 6, 8, 11, 2, 4, 9, 12, 3, 7, 10, 13
2
NVMe PCIe storage (Samsung)
5, 1, 6, 8, 11, 2, 4, 9, 12, 3, 7, 10, 13
13
40Gb NIC x8 (Intel)
5, 1, 6, 8, 11, 2, 4, 9, 12, 3, 7, 10, 13
13
40Gb NIC x8 (Mellanox)
11, 8, 3, 4, 12, 9, 2, 10, 13, 7, 6, 1, 5
8
FC32 HBA (Emulex and QLogic FC16)
5, 1, 6, 8, 11, 2, 4, 9, 12, 3, 7, 10, 13
13
FC32 HBA x8 (Emulex and QLogic FC16)
5, 1, 6, 8, 11, 2, 4, 9, 12, 3, 7, 10, 13
13
25 GB NIC (Broadcom)
5, 1, 6, 8, 11, 2, 4, 9, 12, 3, 7, 10, 13
13
25 GB NIC (Mellanox)
11, 8, 3, 4, 12, 9, 2, 10, 13, 7, 6, 1, 5
8
25 GB NIC x8 (QLogic FC16)
5, 1, 6, 8, 11, 2, 4, 9, 12, 3, 7, 10, 13
13
FC16 HBA (Emulex and QLogic FC16)
5, 1, 6, 8, 11, 2, 4, 9, 12, 3, 7, 10, 13
13
FC8 HBA (Emulex and QLogic FC16)
5, 1, 6, 8, 11, 2, 4, 9, 12, 3, 7, 10, 13
13
1 GB NIC (Broadcom and Intel)
5, 1, 6, 11, 2, 4, 9, 12, 3, 10, 13
11
10 GB NIC dual port (SolarFlare)
5, 1, 6, 8, 11, 2, 4, 9, 12, 3, 7, 10, 13
13
10 GB NIC dual port (Intel, QLogic FC16,
Broadcom)
5, 1, 6, 11, 2, 4, 9, 12, 3, 10, 13
11
10 GB NIC SFP SFP+ dual port (QLogic
FC16)
5, 1, 6, 8, 11, 2, 4, 9, 12, 3, 7, 10, 13
13
10 GB NIC SFP+ dual port (Mellanox)
11, 8, 3, 4, 12, 9, 2, 10, 13, 7, 6, 1, 5
8
10 GB NIC dual port (Broadcom)
5, 1, 6, 8, 11, 2, 4, 9, 12, 3, 7, 10, 13
13
10 GB NIC SFP+ (Intel)
5, 1, 6, 8, 11, 2, 4, 9, 12, 3, 7, 10, 13
13
10 GB NIC Quad port (Intel)
11, 10, 2, 4
4
PERC 9 : Internal Adapter
1,6
2
PCIe Extender
11,12,8
3
PERC 9 : External Adapter
5,1,6,8,11,2,4,9,12,3,7,10,13
2
Removing expansion card riser blank
Prerequisites
1.
Follow the safety guidelines listed in
Safety instructions
on page 65.
2.
Follow the procedure listed in
Before working inside your system
on page 66.
Steps
Hold the expansion card riser blank and lift the blank out of the system.
NOTE:
When you upgrade your system from two processor configuration to four processor, ensure that you remove the
riser blanks from the system.
Installing and removing system components
125