Dell PowerEdge T340 EMC Installation and Service Manual - Page 78

Expansion cards, Expansion card guidelines, Removing an expansion card

Page 78 highlights

Expansion cards NOTE: A System Event Log (SEL) event is logged if an expansion card riser is not supported or missing. It does not prevent your system from turning on. However, if a F1/F2 pause occurs with an error message, see Troubleshooting expansion cards section in the Dell EMC PowerEdge Servers Troubleshooting Guide at www.dell.com/ poweredgemanuals. Expansion card guidelines The following table describes the installation order for installing expansion cards to ensure proper cooling and mechanical fit. The expansion cards with the highest priority must be installed first by using the slot priority indicated. NOTE: The expansion card slots are not hot-swappable. Table 8. Expansion card slots supported on the system board PCIe slot Processor Connection PCIe slot height Slot 1 (Gen3) Processor Full Height Slot 2 (Gen3) Processor Full Height Slot 3 (Gen3) Platform Controller Hub Full Height Slot 4 (Gen3) Platform Controller Hub Full Height PCIe slot length Half Length Half Length Half Length Half Length Slot width x8 link in x8 slot x8 link in x16 slot x1 x4 link in x8 slot Table 9. Expansion card installation order Card Category Priority Card Type 1 Internal Adapter PowerEdge RAID Controller (PERC) H730P+ 2 Internal Adapter PowerEdge RAID Controller (PERC) H330+ 4 Internal Adapter HBA330 6 External Adapter 12 GB SAS HBA 7 NIC 10 G NICs Dual Port (Intel) 8 NIC 10 GBT NICs (Intel) 9 HBA FC8 HBAs 10 Internal storage BOSS 11 Internal storage BOSS2 12 NIC 1 Gb NICs Quad Port (Broadcom) 13 NIC 1 Gb NICs Quad Port (Intel) 14 NIC 1 Gb NICs Dual Port (Broadcom) 15 NIC 1 Gb NICs Quad Port (Intel) Form Factor Full Height Full Height Full Height Full Height Full Height Full Height Full Height Full Height Full height Full Height Full Height Full Height Full Height Slot Priority Maximum Allowed 1,2 1 1,2 1 1,2 1 1,2 2 1,2 2 1,2 2 1,2 2 1,2,4 1 1,2,4 1 1,2,4 3 1,2,4 3 1,2,3,4 4 1,2,4 3 Removing an expansion card Prerequisites 1. Follow the safety guidelines listed in Safety instructions. 2. Follow the procedure listed in Before working inside your system. 3. Remove the air shroud. 78 Installing and removing system components

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126

Expansion cards
NOTE:
A System Event Log (SEL) event is logged if an expansion card riser is not supported or missing. It does not
prevent your system from turning on. However, if a F1/F2 pause occurs with an error message, see
Troubleshooting
expansion cards
section in the
Dell EMC PowerEdge Servers Troubleshooting Guide
at
www.dell.com/
poweredgemanuals
.
Expansion card guidelines
The following table describes the installation order for installing expansion cards to ensure proper cooling and mechanical fit. The
expansion cards with the highest priority must be installed first by using the slot priority indicated.
NOTE:
The expansion card slots are not hot-swappable.
Table 8. Expansion card slots supported on the system board
PCIe slot
Processor Connection
PCIe slot height
PCIe slot length
Slot width
Slot 1 (Gen3)
Processor
Full Height
Half Length
x8 link in x8 slot
Slot 2 (Gen3)
Processor
Full Height
Half Length
x8 link in x16 slot
Slot 3 (Gen3)
Platform Controller Hub
Full Height
Half Length
x1
Slot 4 (Gen3)
Platform Controller Hub
Full Height
Half Length
x4 link in x8 slot
Table 9. Expansion card installation order
Card
Priority
Category
Card Type
Form Factor
Slot Priority
Maximum
Allowed
1
Internal Adapter
PowerEdge RAID Controller (PERC)
H730P+
Full Height
1,2
1
2
Internal Adapter
PowerEdge RAID Controller (PERC)
H330+
Full Height
1,2
1
4
Internal Adapter
HBA330
Full Height
1,2
1
6
External Adapter
12 GB SAS HBA
Full Height
1,2
2
7
NIC
10 G NICs Dual Port (Intel)
Full Height
1,2
2
8
NIC
10 GBT NICs (Intel)
Full Height
1,2
2
9
HBA
FC8 HBAs
Full Height
1,2
2
10
Internal storage
BOSS
Full Height
1,2,4
1
11
Internal storage
BOSS2
Full height
1,2,4
1
12
NIC
1 Gb NICs Quad Port (Broadcom)
Full Height
1,2,4
3
13
NIC
1 Gb NICs Quad Port (Intel)
Full Height
1,2,4
3
14
NIC
1 Gb NICs Dual Port (Broadcom)
Full Height
1,2,3,4
4
15
NIC
1 Gb NICs Quad Port (Intel)
Full Height
1,2,4
3
Removing an expansion card
Prerequisites
1.
Follow the safety guidelines listed in
Safety instructions
.
2.
Follow the procedure listed in
Before working inside your system
.
3.
Remove the air shroud
.
78
Installing and removing system components