IBM 86607SU Hardware Maintenance Manual - Page 242
Preparing the rack, IBM Installation Template
UPC - 087944501329
View all IBM 86607SU manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 242 highlights
Preparing the rack 32 kg (70.5 lbs) 55 kg (121.2 lbs) Caution Use safe lifting practices when lifting the machine. In this section, you will use the following parts: IBM Installation Template Two slide-bracket assemblies One cable-management arm Two bezel brackets Six screws (for attaching the bezel brackets) Sixteen long screws (M6 by 16 mm) Eight short screws (M4 by 8 mm) Six cage nuts Two hex nuts (M6) Four lift handles (shipped with some servers) Cable ties One server bracket (for attaching the cable management arm to the server) Attention To ensure rack stability, plan the installation of servers in the rack starting from the bottom. To attach the mounting hardware to the rack: 1. Remove the rack front door. Refer to the rack documentation for instructions. 2. Mark the positions of the slide-bracket assemblies, bezel brackets, and the cable-management arm on the rack: a. Position the installation template on the front mounting rails on the rack, aligning the holes. b. Mark the holes for the slide-bracket assemblies and bezel brackets. c. Move the template to the same U level at the rear of the server and mark the locations for the slide-bracket assemblies and cable-management arm. d. Install the six cage nuts at the locations marked on the mounting rails. 234 Netfinity Server HMM