Sharp MX-2310U Installation Manual - Page 37

E. Operation check after installation, AC terminal N side with the circuit tester, and confirm

Page 37 highlights

E. Operation check after installation 1) Turn on the dehumidifier heater switch. 2) Measure the resistance value between the earth terminal and the AC terminal (L side), and between the earth terminal and AC terminal (N side) with the circuit tester, and confirm they are not short-circuited. 3) When not using the dehumidifier heater after checking, turn off the dehumidifier heater switch. MX-2310U Dehumidifying heater 3 - 14

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76

MX-2310U
Dehumidifying heater
3 – 14
E.
Operation check after installation
1)
Turn on the dehumidifier heater switch.
2)
Measure the resistance value between the earth terminal and
the AC terminal (L side), and between the earth terminal and
AC terminal (N side) with the circuit tester, and confirm they
are not short-circuited.
3)
When not using the dehumidifier heater after checking, turn off
the dehumidifier heater switch.