Cisco G1 Installation Guide - Page 23
Installing a GBIC-NPE-G1
UPC - 746320679488
View all Cisco G1 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 23 highlights
66774 Chapter 7 NPE-G1 and NPE-G2 Installation and Configuration Information Installing the NPE-G1 or NPE-G2 Installing a GBIC-NPE-G1 Use the instructions in this section to install a GBIC in the NPE-G1. Figure 7-11 Installing a GBIC in the NPE-G1 2 5 1 1 GBIC 2 Alignment groove 3 GBIC port 0/1 3 ETHERNET 0/1 RX GBIC TX 4 GIGABIT LINK ETHERNET 0/2 RJ45 EN RX GBIC 4 GBIC port 0/2 5 Plug Step 1 Turn the GBIC so the label side is up and the alignment groove is down. Note The GBIC is keyed so that it cannot be inserted incorrectly. Step 2 Insert the GBIC into GBIC port 0/1, 0/2, or 0/3. Repeat this step if you are installing more than one GBIC. Note Do not remove the GBIC plugs until you are ready to install the cables. You are finished installing the GBICs. For more information on cabling or specifications, see the "Gigabit Ethernet GBIC Connection Equipment" section on page 5-13. Note We strongly recommend cleaning all optical fiber connections before connecting optical cables to equipment. For information about cleaning optical connectors, see the Inspection and Cleaning Procedures for Fiber-Optic Connections document and the Compressed Air Cleaning Issues for Fiber-Optic Connections document. Go to the "Inserting the NPE-G1 or NPE-G2 into the Router" section on page 7-28 for instructions on installing the NPE-G1 or NPE-G2 in the chassis. OL-4448-12 Network Processing Engine and Network Services Engine Installation and Configuration 7-23