Cisco G1 Installation Guide - Page 37

Reconnecting AC-Input Power to the Cisco uBR7246VXR Router,

Page 37 highlights

Chapter 7 NPE-G1 and NPE-G2 Installation and Configuration Information Installing the NPE-G1 or NPE-G2 Reconnecting AC-Input Power to the Cisco uBR7246VXR Router Figure 7-25 Connecting AC-Input Power to a Cisco uBR7246VXR Router 1 6 5 2 3 66422 4 1 Cable-retention clip 2 Power receptacle 3 Captive installation screw 4 AC power cable 5 Power switch 6 Handle To reconnect AC-input power to a Cisco uBR7246VXR router, complete the following steps: Step 1 Step 2 Step 3 Step 4 At the rear of the router, check that the power switch on the power supply is in the off (O) position. Slide the cable-retention clip to the left away from the AC receptacle, and plug in the power cable. Secure the cable in the power supply AC receptacle by sliding the cable-retention clip to the right until it snaps around the connector. The cable-retention clip provides strain relief for the AC power cable. Plug the AC power supply cable into the AC power source. Note For the Cisco uBR7200 series routers, each AC-input power supply operating at 120 VAC requires a minimum of 7A service. We recommend powering the Cisco uBR7200 series routers from a 120 VAC, 15A receptacle U.S. (240 VAC, 10A international) at the power source. Step 5 Repeat Step 1 through Step 4 if a second power supply is installed. This completes the steps for reconnecting AC-input power to a Cisco uBR7246VXR router. Proceed to the "Powering Up the Router" section on page 7-45. OL-4448-12 Network Processing Engine and Network Services Engine Installation and Configuration 7-37

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68

7-37
Network Processing Engine and Network Services Engine Installation and Configuration
OL-4448-12
Chapter 7
NPE-G1 and NPE-G2 Installation and Configuration Information
Installing the NPE-G1 or NPE-G2
Reconnecting AC-Input Power to the Cisco uBR7246VXR Router
Figure 7-25
Connecting AC-Input Power to a Cisco uBR7246VXR Router
To reconnect AC-input power to a Cisco uBR7246VXR router, complete the following steps:
Step 1
At the rear of the router, check that the power switch on the power supply is in the off (O) position.
Step 2
Slide the cable-retention clip to the left away from the AC receptacle, and plug in the power cable.
Step 3
Secure the cable in the power supply AC receptacle by sliding the cable-retention clip to the right until
it snaps around the connector. The cable-retention clip provides strain relief for the AC power cable.
Step 4
Plug the AC power supply cable into the AC power source.
Note
For the Cisco uBR7200 series routers, each AC-input power supply operating at 120 VAC
requires a minimum of 7A service.
We recommend powering the Cisco uBR7200 series routers from a 120 VAC, 15A receptacle
U.S. (240 VAC, 10A international) at the power source.
Step 5
Repeat Step 1 through Step 4 if a second power supply is installed.
This completes the steps for reconnecting AC-input power to a Cisco uBR7246VXR router. Proceed to
the
“Powering Up the Router” section on page 7-45
.
1
Cable-retention clip
4
AC power cable
2
Power receptacle
5
Power switch
3
Captive installation screw
6
Handle
66422
3
4
2
5
1
6