Cisco G1 Installation Guide - Page 34
Installing the Default Cable-Management Bracket on a Cisco uBR7246VXR Router (Optional),
UPC - 746320679488
View all Cisco G1 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 34 highlights
Installing the NPE-G1 or NPE-G2 Chapter 7 NPE-G1 and NPE-G2 Installation and Configuration Information You have finished installing the cable-management brackets. Go to the "Reconnecting Input Power and Powering Up the Router" section on page 7-35. Installing the Default Cable-Management Bracket on a Cisco uBR7246VXR Router (Optional) If you are not using the NPE-G1 cable-management bracket, you can alternatively use two cable-management bracket configurations for the Cisco uBR7246VXR router. In the first configuration, for a 4-post rack, the rack-mount brackets are installed at the rear of the chassis and the cable-management bracket is installed at the right front of the chassis. (See Figure 7-22.) You must install both sets of brackets before you install the chassis in the rack. In the second configuration, for a telco-type rack, the rack-mount brackets are installed at the middle of the chassis and the cable-management bracket is installed at the right front of the chassis. (See Figure 7-23.) You must install both sets of brackets before you install the chassis in the rack. Note The cable-management bracket must be installed on the right side of the chassis when viewed from the front. Figure 7-22 Installing the Chassis in a 4-Post Rack with an Installed Cable-Management Bracket 93812 1 2 1 Rack-mount bracket 2 Cable-management bracket 7-34 Network Processing Engine and Network Services Engine Installation and Configuration OL-4448-12