Installing the Default Cable-Management Bracket on a Cisco uBR7246VXR Router (Optional),

Page 34 highlights

Installing the NPE-G1 or NPE-G2 Chapter 7 NPE-G1 and NPE-G2 Installation and Configuration Information You have finished installing the cable-management brackets. Go to the "Reconnecting Input Power and Powering Up the Router" section on page 7-35. Installing the Default Cable-Management Bracket on a Cisco uBR7246VXR Router (Optional) If you are not using the NPE-G1 cable-management bracket, you can alternatively use two cable-management bracket configurations for the Cisco uBR7246VXR router. In the first configuration, for a 4-post rack, the rack-mount brackets are installed at the rear of the chassis and the cable-management bracket is installed at the right front of the chassis. (See Figure 7-22.) You must install both sets of brackets before you install the chassis in the rack. In the second configuration, for a telco-type rack, the rack-mount brackets are installed at the middle of the chassis and the cable-management bracket is installed at the right front of the chassis. (See Figure 7-23.) You must install both sets of brackets before you install the chassis in the rack. Note The cable-management bracket must be installed on the right side of the chassis when viewed from the front. Figure 7-22 Installing the Chassis in a 4-Post Rack with an Installed Cable-Management Bracket 93812 1 2 1 Rack-mount bracket 2 Cable-management bracket 7-34 Network Processing Engine and Network Services Engine Installation and Configuration OL-4448-12

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68

7-34
Network Processing Engine and Network Services Engine Installation and Configuration
OL-4448-12
Chapter 7
NPE-G1 and NPE-G2 Installation and Configuration Information
Installing the NPE-G1 or NPE-G2
You have finished installing the cable-management brackets. Go to the
“Reconnecting Input Power and
Powering Up the Router” section on page 7-35
.
Installing the Default Cable-Management Bracket on a Cisco uBR7246VXR Router (Optional)
If you are not using the NPE-G1 cable-management bracket, you can alternatively use two
cable-management bracket configurations for the Cisco uBR7246VXR router. In the first configuration,
for a 4-post rack, the rack-mount brackets are installed at the rear of the chassis and the
cable-management bracket is installed at the right front of the chassis. (See
Figure 7-22
.) You must
install both sets of brackets before you install the chassis in the rack.
In the second configuration, for a telco-type rack, the rack-mount brackets are installed at the middle of
the chassis and the cable-management bracket is installed at the right front of the chassis. (See
Figure 7-23
.) You must install both sets of brackets before you install the chassis in the rack.
Note
The cable-management bracket must be installed on the right side of the chassis when viewed from the
front.
Figure 7-22
Installing the Chassis in a 4-Post Rack with an Installed Cable-Management Bracket