Dell PowerEdge C6420 EMC Installation and Service Manual - Page 114
Removing the OCP card
View all Dell PowerEdge C6420 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 114 highlights
Figure 68. Installing the mezzanine card bridge board Next steps 1. Install the mezzanine card. 2. Install the expansion card riser assembly. 3. Follow the procedure listed in After working inside your system. Removing the OCP card Prerequisites NOTE: The procedure to remove the mezzanine blank is similar to the removal of a mezzanine card. 1. Follow the safety guidelines listed in Safety instructions. 2. Follow the procedure listed in Before working inside your system. 3. Remove the mezzanine card. Steps 1. Push the blue retention clips away on one side and release the Open Compute Project (OCP) card. Repeat step 1 to release the card from the clips on the other side. 2. Slide the card toward the front of the sled to disengage the connectors from the chassis and lift the card up. 114 Installing and removing enclosure components