HP Surestore Tape Library Model 20/700 HP Surestore Bridge FC 2/1 LV and FC 4/ - Page 65

Fibre Bridge Connection, Basic Configuration for the FC 2/1 LV

Page 65 highlights

Figure 26 Note A basic point-to-point (PPP) configuration is one HBA to one bridge. Note All SCSI targets in an MO jukebox must be connected to a single bridge using a single SCSI connection. SCSI targets in a two-bus MO jukebox may be connected using a double SCSI connection. 3. Connect one end of the optical cable into the GBIC on the bridge and the other end into the Fibre Channel HBA in the host (the HBA may also require a GBIC). 4. Connect the power cord from the bridge to a power strip in the library. 5. Confirm that all cable ends are connected securely and that the end of each bus is properly terminated. The bridge, in its default configuration, provides internal termination at the end of each SCSI bus. 6. See Powering on the System on page 76. Fibre Bridge Connection, Basic Configuration for the FC 2/1 LV Chapter 3 Chapter 3 Installing Cables 67

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172
  • 173
  • 174
  • 175
  • 176
  • 177
  • 178
  • 179
  • 180
  • 181
  • 182
  • 183
  • 184
  • 185
  • 186
  • 187
  • 188
  • 189
  • 190
  • 191
  • 192
  • 193
  • 194
  • 195
  • 196
  • 197
  • 198
  • 199
  • 200
  • 201
  • 202
  • 203
  • 204
  • 205
  • 206
  • 207
  • 208
  • 209
  • 210
  • 211
  • 212
  • 213
  • 214
  • 215
  • 216
  • 217
  • 218
  • 219
  • 220
  • 221
  • 222
  • 223
  • 224
  • 225
  • 226
  • 227
  • 228
  • 229
  • 230
  • 231
  • 232
  • 233
  • 234
  • 235
  • 236
  • 237
  • 238
  • 239
  • 240
  • 241
  • 242
  • 243
  • 244
  • 245
  • 246
  • 247
  • 248
  • 249
  • 250
  • 251
  • 252
  • 253
  • 254
  • 255
  • 256
  • 257
  • 258
  • 259
  • 260

Chapter 3
Installing Cables
67
Chapter 3
Note
A basic point-to-point (PPP) configuration is one HBA to one
bridge.
Note
All SCSI targets in an MO jukebox must be connected to a single
bridge using a single SCSI connection. SCSI targets in a two-bus
MO jukebox may be connected using a double SCSI connection.
3.
Connect one end of the optical cable into the GBIC on the bridge and the
other end into the Fibre Channel HBA in the host (the HBA may also
require a GBIC).
4.
Connect the power cord from the bridge to a power strip in the library.
5.
Confirm that all cable ends are connected securely and that the end of
each bus is properly terminated. The bridge, in its default configuration,
provides internal termination at the end of each SCSI bus.
6. See
Powering on the System
on page 76.
Figure 26
Fibre Bridge Connection, Basic Configuration for the FC 2/1 LV