Intel SC5400RA User Guide - Page 45
Hardware Installations and Upgrades, Before You Begin, Tools and Supplies Needed, System References
UPC - 675900759336
View all Intel SC5400RA manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 45 highlights
2 Hardware Installations and Upgrades Before You Begin Before working with your server product, pay close attention to the "Safety Information" on page iii. This document provides instructions for adding and replacing server system components. Tools and Supplies Needed • Phillips* (cross head) screwdriver (#1 bit and #2 bit) • Needle nosed pliers • Antistatic wrist strap and conductive foam pad (recommended) System References All references to left, right, front, top, and bottom assume the reader is facing the front of the server system as it would be positioned for normal operation. 23
23
2
Hardware Installations and
Upgrades
Before You Begin
Before working with your server product, pay close attention to the
“Safety Information”
on page iii
.
This document provides instructions for adding and replacing server system components.
Tools and Supplies Needed
•
Phillips* (cross head) screwdriver (#1 bit and #2 bit)
•
Needle nosed pliers
•
Antistatic wrist strap and conductive foam pad (recommended)
System References
All references to left, right, front, top, and bottom assume the reader is facing the front of
the server system as it would be positioned for normal operation.