Sharp PN-V601 Sharp Digital Signage Software (SDSS™) Operation Manual - Page 74
●Saving a schedule, ●Opening a schedule
UPC - 074000047068
View all Sharp PN-V601 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 74 highlights
Schedule Editor Creating a schedule ●Saving a schedule Save schedule Use this option when you want to save the currently edited schedule under its original name. 1. From the [File] menu, click [Save Schedule]. You can also save a schedule by clicking . The schedule file will be overwritten and saved with the same name. When "Schedule Editor" is started, the title bar will read "Untitled". If you attempt to save at this stage the [Save Schedule] dialog box will be displayed. For the remaining steps, refer to step 2 of "Save schedule as". Save schedule as Use this option when you want to save the currently edited schedule under a different name. 1. From the [File] menu, click [Save Schedule As]. The [Save Schedule As] dialog box will appear. 2. Select the schedule folder in which the schedule is to be saved. 3. Enter a "Schedule Name", and click [Save]. The schedule will be saved with a different name. ●Opening a schedule Load a schedule that you have already saved, and use it. Editing only the places you want to change in an existing file and saving the file under a new name is an efficient way to create schedules. 1. From the [File] menu, click [Open Schedule]. You can also open a schedule by clicking . The [Open Schedule] dialog box will appear. 2. Select the schedule folder containing the schedule. 3. From the "List of Schedule", select a schedule, and click [Open]. The schedule you selected will be loaded into Schedule Editor and you will be able to edit it. Take care when saving a schedule you have edited using the [Save Schedule] option, as the changes you have made will be reflected in the original file. 74