Cisco WS-C2960S-24TS-S Hardware Installation Guide - Page 33

Switch Installation (24- and 48-Port Switches), Preparing for Installation

Page 33 highlights

2 C H A P T E R Switch Installation (24- and 48-Port Switches) This chapter describes how to start your switch and how to interpret the power-on self-test (POST) that ensures proper operation. It also describes how to install the switch and how to make connections to the switch. This chapter provides installation information for all Catalyst 2960 switches, except for the Catalyst 2960-8TC-S, 2960-8TC-L, 2960G-8T-LC, 2960-48PST-L, and 2960PD-8TT-L switches. For those switches, see Chapter 3, "Switch Installation (8-Port Switches)." The instructions in this chapter for connecting to the switch ports and for installing and connecting to the small form-factor pluggable (SFP) modules apply to all Catalyst 2960 switches, including the 8-port switches. Read the topics and perform the procedures in this order: • Preparing for Installation, page 2-1 • Verifying Switch Operation, page 2-5 • Installing the Switch, page 2-6 • Connecting to the 10/100 and 10/100/1000 Ports, page 2-14 • Installing and Removing SFP Modules, page 2-15 • Connecting to SFP Modules, page 2-18 • Connecting to a Dual-Purpose Port, page 2-20 • Where to Go Next, page 2-21 Preparing for Installation This section covers these topics: • Warnings, page 2-2 • Guidelines for Particulate Matter, page 2-4 • Installation Guidelines, page 2-4 • Box Contents, page 2-5 • Tools and Equipment, page 2-5 OL-7075-09 Catalyst 2960 Switch Hardware Installation Guide 2-1

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108

CHAPTER
2-1
Catalyst 2960 Switch Hardware Installation Guide
OL-7075-09
2
Switch Installation (24- and 48-Port Switches)
This chapter describes how to start your switch and how to interpret the power-on self-test (POST) that
ensures proper operation. It also describes how to install the switch and how to make connections to the
switch.
This chapter provides installation information for all Catalyst 2960 switches, except for the
Catalyst 2960-8TC-S, 2960-8TC-L, 2960G-8T-LC, 2960-48PST-L, and 2960PD-8TT-L switches. For
those switches, see
Chapter 3, “Switch Installation (8-Port Switches).”
The instructions in this chapter for connecting to the switch ports and for installing and connecting to
the small form-factor pluggable (SFP) modules apply to all Catalyst 2960 switches, including the 8-port
switches.
Read the topics and perform the procedures in this order:
Preparing for Installation, page 2-1
Verifying Switch Operation, page 2-5
Installing the Switch, page 2-6
Connecting to the 10/100 and 10/100/1000 Ports, page 2-14
Installing and Removing SFP Modules, page 2-15
Connecting to SFP Modules, page 2-18
Connecting to a Dual-Purpose Port, page 2-20
Where to Go Next, page 2-21
Preparing for Installation
This section covers these topics:
Warnings, page 2-2
Guidelines for Particulate Matter, page 2-4
Installation Guidelines, page 2-4
Box Contents, page 2-5
Tools and Equipment, page 2-5