Cisco WS-C2960S-24TS-S Hardware Installation Guide - Page 60

Desk- or Shelf-Mounting (without Mounting Screws), Appendix C

Page 60 highlights

Installing the Switch Chapter 3 Switch Installation (8-Port Switches) • Under the Desk- or Shelf-Mounting (with Mounting Screws), page 3-8 • Wall-Mounting (with Mounting Screws), page 3-11 • Magnet Mounting, page 3-14 • Rack-Mounting, page 3-15 • Wall-Mounting (with Rack-Mount Brackets), page 3-16 Desk- or Shelf-Mounting (without Mounting Screws) This section is specific to the Catalyst 2960 8-port switches. For information applicable to the other Catalyst 2960 switches, see Chapter 2, "Switch Installation (24- and 48-Port Switches)." The switch can be installed on top of a desk or shelf with or without mounting screws. If you do not want to use the mounting screws, follow these steps: Step 1 Step 2 Locate the adhesive strip with the rubber feet in the accessory kit. Remove the four rubber feet from the adhesive strip, and attach them to the recessed areas on the bottom of the unit. This prevents the switch from sliding on the desk or shelf. Note We strongly recommend that you attach the rubber feet. Doing so helps prevent airflow restriction and overheating. Step 3 Place the switch on the desk or shelf. Note We strongly recommend that you allow at least 3 inches (7.6 cm) of clearance around the ventilation openings to prevent airflow restriction and overheating. Do not stack switches or place switches side-by-side unless they are separated on all sides by at least 3 inches (7.6 cm) of clearance from each other. Do not place any items on the top of the switch. After the switch is mounted on the desk or shelf, do these tasks to complete the installation: 1. Power on the switch. See the "Verifying Switch Operation" section on page 3-5. 2. Connect to a 10/100 or 10/100/1000 port, and run Express Setup. See the switch getting started guide for instructions. 3. Connect to the front-panel ports. See the "Connecting to the 10/100 and 10/100/1000 Ports" section on page 2-14, the "Connecting to SFP Modules" section on page 2-18, and the "Connecting to a Dual-Purpose Port" section on page 2-20 to complete the installation. For configuration instructions about using the command-line interface (CLI) setup program, go to Appendix C, "Configuring the Switch with the CLI-Based Setup Program." Catalyst 2960 Switch Hardware Installation Guide 3-6 OL-7075-09

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108

3-6
Catalyst 2960 Switch Hardware Installation Guide
OL-7075-09
Chapter 3
Switch Installation (8-Port Switches)
Installing the Switch
Under the Desk- or Shelf-Mounting (with Mounting Screws), page 3-8
Wall-Mounting (with Mounting Screws), page 3-11
Magnet Mounting, page 3-14
Rack-Mounting, page 3-15
Wall-Mounting (with Rack-Mount Brackets), page 3-16
Desk- or Shelf-Mounting (without Mounting Screws)
This section is specific to the Catalyst 2960 8-port switches. For information applicable to the other
Catalyst 2960 switches, see
Chapter 2, “Switch Installation (24- and 48-Port Switches).”
The switch can be installed on top of a desk or shelf with or without mounting screws. If you do not want
to use the mounting screws, follow these steps:
Step 1
Locate the adhesive strip with the rubber feet in the accessory kit.
Step 2
Remove the four rubber feet from the adhesive strip, and attach them to the recessed areas on the bottom
of the unit. This prevents the switch from sliding on the desk or shelf.
Note
We strongly recommend that you attach the rubber feet. Doing so helps prevent airflow
restriction and overheating.
Step 3
Place the switch on the desk or shelf.
Note
We strongly recommend that you allow at least 3 inches (7.6 cm) of clearance around the
ventilation openings to prevent airflow restriction and overheating.
Do not stack switches or place switches side-by-side unless they are separated on all sides by at
least 3 inches (7.6 cm) of clearance from each other.
Do not place any items on the top of the switch.
After the switch is mounted on the desk or shelf, do these tasks to complete the installation:
1.
Power on the switch. See the
“Verifying Switch Operation” section on page 3-5
.
2.
Connect to a 10/100 or 10/100/1000 port, and run Express Setup. See the switch getting started guide
for instructions.
3.
Connect to the front-panel ports. See the
“Connecting to the 10/100 and 10/100/1000 Ports” section
on page 2-14
, the
“Connecting to SFP Modules” section on page 2-18
, and the
“Connecting to a
Dual-Purpose Port” section on page 2-20
to complete the installation.
For configuration instructions about using the command-line interface (CLI) setup program, go to
Appendix C, “Configuring the Switch with the CLI-Based Setup Program.”