Cisco WS-C2960S-24TS-S Hardware Installation Guide - Page 4

Switch Installation 24- and 48-Port Switches, Attaching Brackets to the Catalyst 2960 Switch

Page 4 highlights

Contents 2 C H A P T E R 3 C H A P T E R Switch Installation (24- and 48-Port Switches) 2-1 Preparing for Installation 2-1 Warnings 2-2 Guidelines for Particulate Matter 2-4 Installation Guidelines 2-4 Box Contents 2-5 Tools and Equipment 2-5 Verifying Switch Operation 2-5 Installing the Switch 2-6 Rack-Mounting 2-6 Removing Screws from the Switch 2-7 Attaching Brackets to the Catalyst 2960 Switch 2-7 Mounting the Switch in a Rack 2-10 Attaching the Cable Guide 2-11 Wall-Mounting 2-11 Attaching the Brackets to the Switch for Wall-Mounting 2-12 Attaching the RPS Connector Cover 2-12 Mounting the Switch on a Wall 2-13 Table- or Shelf-Mounting 2-14 Connecting to the 10/100 and 10/100/1000 Ports 2-14 Installing and Removing SFP Modules 2-15 Installing SFP Modules 2-16 Removing SFP Modules 2-17 Connecting to SFP Modules 2-18 Connecting to Fiber-Optic SFP Modules 2-18 Connecting to 1000BASE-T SFP Modules 2-19 Connecting to a Dual-Purpose Port 2-20 Where to Go Next 2-21 Switch Installation (8-Port Switches) 3-1 Preparing for Installation 3-1 Warnings 3-1 Installation Guidelines 3-3 Equipment That You Supply 3-4 Box Contents 3-5 Tools and Equipment 3-5 Verifying Switch Operation 3-5 Installing the Switch 3-5 Catalyst 2960 Switch Hardware Installation Guide iv OL-7075-09

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108

Contents
iv
Catalyst 2960 Switch Hardware Installation Guide
OL-7075-09
CHAPTER
2
Switch Installation (24- and 48-Port Switches)
2-1
Preparing for Installation
2-1
Warnings
2-2
Guidelines for Particulate Matter
2-4
Installation Guidelines
2-4
Box Contents
2-5
Tools and Equipment
2-5
Verifying Switch Operation
2-5
Installing the Switch
2-6
Rack-Mounting
2-6
Removing Screws from the Switch
2-7
Attaching Brackets to the Catalyst 2960 Switch
2-7
Mounting the Switch in a Rack
2-10
Attaching the Cable Guide
2-11
Wall-Mounting
2-11
Attaching the Brackets to the Switch for Wall-Mounting
2-12
Attaching the RPS Connector Cover
2-12
Mounting the Switch on a Wall
2-13
Table- or Shelf-Mounting
2-14
Connecting to the 10/100 and 10/100/1000 Ports
2-14
Installing and Removing SFP Modules
2-15
Installing SFP Modules
2-16
Removing SFP Modules
2-17
Connecting to SFP Modules
2-18
Connecting to Fiber-Optic SFP Modules
2-18
Connecting to 1000BASE-T SFP Modules
2-19
Connecting to a Dual-Purpose Port
2-20
Where to Go Next
2-21
CHAPTER
3
Switch Installation (8-Port Switches)
3-1
Preparing for Installation
3-1
Warnings
3-1
Installation Guidelines
3-3
Equipment That You Supply
3-4
Box Contents
3-5
Tools and Equipment
3-5
Verifying Switch Operation
3-5
Installing the Switch
3-5