Cisco WS-C2960S-24TS-S Hardware Installation Guide - Page 64

Mounting the Switch Under a Desk or Shelf

Page 64 highlights

Installing the Switch Chapter 3 Switch Installation (8-Port Switches) Figure 3-4 1 Mounting the Switch Under a Desk or Shelf 2 Catalyst 296Se0ries 1 204640 8x 7x 6x 5x 4x 3x STAT DPLX SPD 1x 2x CONSOLE SYST 3 1 Desk or shelf 2 Screws 3 Slides on this way After the switch is mounted under the desk or shelf, do these tasks to complete the installation: 1. Power on the switch. See the "Verifying Switch Operation" section on page 3-5. 2. Connect to a 10/100 or 10/100/1000 port, and run Express Setup. See the switch getting started guide for instructions. 3. Connect to the front-panel ports. See the "Connecting to the 10/100 and 10/100/1000 Ports" section on page 2-14, the "Connecting to SFP Modules" section on page 2-18, and the "Connecting to a Dual-Purpose Port" section on page 2-20 to complete the installation. For configuration instructions about using the CLI setup program, go to Appendix C, "Configuring the Switch with the CLI-Based Setup Program." 3-10 Catalyst 2960 Switch Hardware Installation Guide OL-7075-09

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108

3-10
Catalyst 2960 Switch Hardware Installation Guide
OL-7075-09
Chapter 3
Switch Installation (8-Port Switches)
Installing the Switch
Figure 3-4
Mounting the Switch Under a Desk or Shelf
After the switch is mounted under the desk or shelf, do these tasks to complete the installation:
1.
Power on the switch. See the
“Verifying Switch Operation” section on page 3-5
.
2.
Connect to a 10/100 or 10/100/1000 port, and run Express Setup. See the switch getting started guide
for instructions.
3.
Connect to the front-panel ports. See the
“Connecting to the 10/100 and 10/100/1000 Ports” section
on page 2-14
, the
“Connecting to SFP Modules” section on page 2-18
, and the
“Connecting to a
Dual-Purpose Port” section on page 2-20
to complete the installation.
For configuration instructions about using the CLI setup program, go to
Appendix C, “Configuring the
Switch with the CLI-Based Setup Program.”
1
Desk or shelf
3
Slides on this way
2
Screws
Catalyst 2960
S
eries
S
TAT
DPLX
S
PD
S
Y
S
T
CON
S
OLE
3
1x
2x
3x
4x
5x
6x
7x
8x
1
1
2
204640