Epson Equity 486DX2/50 PLUS User Manual - Page 119
Installing SlMMs, each SIMM with the notched edge toward the top of
View all Epson Equity 486DX2/50 PLUS manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 119 highlights
Installing SlMMs Follow these steps to install SIMMs: 1. Turn the memory card on your work surface so the connectors at the bottom of the board are toward you. The sockets are labeled as shown below. 2. It is easiest to install SIMMs in the left sockets first. Position each SIMM with the notched edge toward the top of the socket and insert it on the right side of the tabs at an angle, as shown below. tab 6-16 Installing and Removing Options
Installing SlMMs
Follow these steps to install SIMMs:
1.
Turn the memory card on your work surface so the
connectors at the bottom of the board are toward you.
The sockets are labeled as shown below.
2.
It is easiest to install SIMMs in the left sockets first. Position
each SIMM with the notched edge toward the top of the
socket and insert it on the right side of the tabs at an angle,
as shown below.
tab
6-16
Installing and
Removing
Options