Gateway E-9510T Gateway 9510 Server User Guide - Page 22

If necessary, re-orient the plastic filler panels in the plastic bezel., buttons on the bezel.

Page 22 highlights

Setting up the hardware 13 Install three rack stud screws (provided in the rack conversion kit) along each side of the server in the holes provided. 14 Reinstall the bezel assembly by following the instructions in "To install the standard plastic bezel assembly:" on page 49, then install the hinge cover (provided with the rack conversion kit) by snapping it into place. - OR - Install the optional metal security bezel by following the instructions in "To install the optional metal security bezel (for rackmount configuration):" on page 51. 15 If necessary, re-orient the plastic filler panels in the plastic bezel. 16 Affix the new LED and Button label (readable from the horizontal) over the LEDs and buttons on the bezel. 17 Reinstall the cover by following the instructions in "Closing the server case" on page 52. 18 Install the rackmount rail kit by following the instructions in the manual that accompanied the kit. www.gateway.com 17

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172
  • 173
  • 174
  • 175
  • 176
  • 177
  • 178
  • 179
  • 180
  • 181
  • 182
  • 183
  • 184
  • 185
  • 186
  • 187
  • 188
  • 189
  • 190
  • 191
  • 192
  • 193
  • 194
  • 195
  • 196
  • 197
  • 198
  • 199
  • 200
  • 201
  • 202
  • 203
  • 204
  • 205
  • 206
  • 207
  • 208
  • 209
  • 210
  • 211
  • 212
  • 213
  • 214
  • 215
  • 216
  • 217
  • 218
  • 219
  • 220
  • 221
  • 222

17
www.gateway.com
Setting up the hardware
13
Install three rack stud screws (provided in the rack conversion kit) along each side of
the server in the holes provided.
14
Reinstall the bezel assembly by following the instructions in
“To install the standard
plastic bezel assembly:” on page 49
, then install the hinge cover (provided with the
rack conversion kit) by snapping it into place.
- OR -
Install the optional metal security bezel by following the instructions in
“To install
the optional metal security bezel (for rackmount configuration):” on page 51
.
15
If necessary, re-orient the plastic filler panels in the plastic bezel.
16
Affix the new LED and Button label (readable from the horizontal) over the LEDs and
buttons on the bezel.
17
Reinstall the cover by following the instructions in
“Closing the server case” on
page 52
.
18
Install the rackmount rail kit by following the instructions in the manual that
accompanied the kit.