Gateway E-9510T Gateway 9510 Server User Guide - Page 47
Opening the server case
View all Gateway E-9510T manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 47 highlights
Chapter 4: Installing Components Opening the server case Because the components inside your server are extremely sensitive to static electricity, make sure that you follow the instructions at the beginning of this chapter to avoid static electricity damage. Caution For correct cooling and air flow, always reinstall the side panel and the air duct (if included) before you turn on the server. Operating the server without the cover in place can damage server components. To open the server case: 1 Follow the instructions in "Preventing static electricity discharge" on page 41. 2 Turn off the server, then unplug the power cords and all other cables connected to the server. Warning This server may have two power cords. To disconnect internal AC power, you must unplug both power cords. 3 For more stability, place the server on its side. Release latch Shipping screw 4 If the shipping screw is installed, remove it. 42 www.gateway.com