Gateway E-9510T Gateway 9510 Server User Guide - Page 82
Installing an Intel Management Module IMM, to the hole in the system board see the illustration
View all Gateway E-9510T manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 82 highlights
Installing an Intel Management Module (IMM) 5 Install the nylon standoff into the hole in the IMM module board which corresponds to the hole in the system board (see the illustration on page 77). Important The snap fit ends of the standoffs go into the holes in the IMM module board. The snap lock ends of the standoffs go into holes in the system board. Snap fit end goes into IMM board. Snap lock end goes into system board. 6 Find the IMM connector on the lower front portion of the system board. Standoff hole IMM connector www.gateway.com 77
77
www.gateway.com
Installing an Intel Management Module (IMM)
5
Install the nylon standoff into the hole in the IMM module board which corresponds
to the hole in the system board (see the illustration on
page 77
).
6
Find the IMM connector on the lower front portion of the system board.
Important
The snap fit ends of the standoffs go into the holes in the IMM module
board. The snap lock ends of the standoffs go into holes in the system
board.
Snap fit end goes into
IMM board.
Snap lock end goes
into system board.
IMM connector
Standoff hole