Gateway E-9510T Gateway 9510 Server User Guide - Page 87
Plug the power cord into the new power supply module. The new power supply
View all Gateway E-9510T manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 87 highlights
Chapter 4: Installing Components 4 While pressing the green latch on the power supply module, grasp the handle and pull the module straight out from the server. 5 Slide the new power supply module into the power supply bay until the green latch snaps into place. 6 Replace the shipping screw (if necessary). 7 Plug the power cord into the new power supply module. The new power supply module is ready if the left (green) LED is on. 82 www.gateway.com
82
www.gateway.com
Chapter 4: Installing Components
4
While pressing the green latch on the power supply module, grasp the handle and
pull the module straight out from the server.
5
Slide the new power supply module into the power supply bay until the green latch
snaps into place.
6
Replace the shipping screw (if necessary).
7
Plug the power cord into the new power supply module. The new power supply
module is ready if the left (green) LED is on.