HP ML530 ProLiant ML530 Generation 2 Server Setup and Installation Guide - Page 149
Server Installation Overview, Server Shipping Contents of Planning the Server
UPC - 720591250669
View all HP ML530 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 149 highlights
Installing the Rack Server • Installing the server into the rack - Loading the server into the rack rails - Attaching the cable management arm - Reinstalling the power supplies • Securing the server in the rack for shipping • Connecting the AC power cord and peripheral devices • Securing cables with the cable management arm • Powering up the server • Installing an operating system • Registering your server • Routine maintenance The chapter concludes with routine maintenance guidelines and resources. For additional information, visit the HP website: www.hp.com/servers/proliant Server Installation Overview Installing the server in the rack requires the following actions: 1. Select an appropriate site for your server based on the environmental and stability requirements discussed in Chapter 2, "Planning the Server Installation." 2. Unpack the server and locate the rack-mounting hardware described in the "Server Shipping Contents" section of Chapter 2, "Planning the Server Installation." 3. Install any expansion boards or hardware options such as memory. To install the major hardware items, see Chapter 3, "Installing Hardware Options" or follow the installation instructions provided in each hardware option kit. 4. To minimize server weight, remove the hot-plug power supplies and do not install hot-plug hard drives until the server is mounted in the rack. See "Removing the Power Supplies" in this chapter. 5-2 HP ProLiant ML530 Generation 2 Server Setup and Installation Guide