HP ML530 ProLiant ML530 Generation 2 Server Setup and Installation Guide - Page 162
Installing the Server into the Rack, Loading the Server into the Rack Rails
UPC - 720591250669
View all HP ML530 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 162 highlights
Installing the Rack Server Installing the Server into the Rack To complete the server rack installation: • Load the server into the rack rails. • Attach the cable management arm. • Reinstall the power supplies. Loading the Server into the Rack Rails WARNING: The server is very heavy, up to 66 kg (146 lb). To reduce the risk of personal injury or damage to the equipment: • Remove all hot-plug power supplies to reduce the weight of the server before lifting it. • Observe local occupational health and safety requirements and guidelines for material handling. • Get help to lift and maneuver the server. To load the server into the rack and secure it with the rack bezel thumbscrews: 1. Be sure that each rack rail assembly is perfectly aligned and securely installed in the rack. HP ProLiant ML530 Generation 2 Server Setup and Installation Guide 5-15