HP StorageWorks 2/64 HP StorageWorks Core Switch 2/64 Getting Started & Ge - Page 23
Using a 1/2-inch socket wrench, remove the four bolts from the brackets
![]() |
View all HP StorageWorks 2/64 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 23 highlights
To unpack and install the switch in a rack: 1. Remove the crate top of the shipping carton from pallet. Removing the crate top may require two people. 2. Check contents of the shipping carton to verify all the required parts and hardware are available. 3. Using a 1/2-inch socket wrench, remove the four bolts from the brackets that secure the switch to the pallet (see Figure 5). Because you will not need to use the bolts for this installation, you can discard them. Figure 5. Removing the Switch from the Pallet Pallet Bolts (4x) Installing the Switch 15
![](/manual_guide/products/hewlettpackard-storageworks-264-hp-storageworks-core-switch-264-getting-started-general-reference-guide-4e71e98/23.png)
Installing the Switch
15
To unpack and install the switch in a rack:
1.
Remove the crate top of the shipping carton from pallet. Removing the
crate top may require two people.
2.
Check contents of the shipping carton to verify all the required parts and
hardware are available.
3.
Using a 1/2-inch socket wrench, remove the four bolts from the brackets
that secure the switch to the pallet (see
Figure 5
). Because you will not
need to use the bolts for this installation, you can discard them.
Figure 5.
Removing the Switch from the Pallet
Pallet Bolts (4x)