HP StorageWorks 2/64 HP StorageWorks Core Switch 2/64 Getting Started & Ge - Page 39

Starting and Configuring the Switch, Providing Initial Power to the Switch

Page 39 highlights

3 STARTING AND CONFIGURING THE SWITCH Providing Initial Power to the Switch 1. Connect the AC power cord retainer to the chassis: Adjusting Screw Chassis Screw Figure 19. Power Cord Retainer a. Orient one of the retainers as shown in Figure 19. b. Position the retainer tabs under the two screws on either side of a power connector on the chassis. Tighten both screws. c. Loosen the adjusting screw to allow the power cord to fit into the retainer. d. Repeat Step 1 for the other retainer. 2. Connect the power cords to the power connectors on the HP StorageWorks Core Switch 2/64 by inserting them through the retainers. Ensure the power cord has a minimum service loop of six inches available at the connection to the switch, and is routed so that it is not exposed to stress. Starting and Configuring the Switch 31

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94

Starting and Configuring the Switch
31
3
STARTING AND CONFIGURING THE
SWITCH
Providing Initial Power to the Switch
1.
Connect the AC power cord retainer to the chassis:
Figure 19.
Power Cord Retainer
a.
Orient one of the retainers as shown in
Figure 19
.
b.
Position the retainer tabs under the two screws on either side of a power
connector on the chassis. Tighten both screws.
c.
Loosen the adjusting screw to allow the power cord to fit into the
retainer.
d. Repeat
Step 1
for the other retainer.
2.
Connect the power cords to the power connectors on the HP StorageWorks
Core Switch 2/64 by inserting them through the retainers. Ensure the
power cord has a minimum service loop of six inches available at the
connection to the switch, and is routed so that it is not exposed to stress.
Adjusting Screw
Chassis
Screw