HP StorageWorks 2/64 HP StorageWorks Core Switch 2/64 Getting Started & Ge - Page 39
Starting and Configuring the Switch, Providing Initial Power to the Switch
![]() |
View all HP StorageWorks 2/64 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 39 highlights
3 STARTING AND CONFIGURING THE SWITCH Providing Initial Power to the Switch 1. Connect the AC power cord retainer to the chassis: Adjusting Screw Chassis Screw Figure 19. Power Cord Retainer a. Orient one of the retainers as shown in Figure 19. b. Position the retainer tabs under the two screws on either side of a power connector on the chassis. Tighten both screws. c. Loosen the adjusting screw to allow the power cord to fit into the retainer. d. Repeat Step 1 for the other retainer. 2. Connect the power cords to the power connectors on the HP StorageWorks Core Switch 2/64 by inserting them through the retainers. Ensure the power cord has a minimum service loop of six inches available at the connection to the switch, and is routed so that it is not exposed to stress. Starting and Configuring the Switch 31
![](/manual_guide/products/hewlettpackard-storageworks-264-hp-storageworks-core-switch-264-getting-started-general-reference-guide-4e71e98/39.png)