HP StorageWorks 2/64 HP StorageWorks Core Switch 2/64 Getting Started & Ge - Page 33
Using the ten #10-32 flat-head screws removed earlier, reattach
![]() |
View all HP StorageWorks 2/64 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 33 highlights
11. From the rear side of the rack, reattach the following items to the chassis: a. Using the seven #10-32 flat-head screws removed earlier, reattach the right front mounting bracket to the chassis (see Figure 15). #10-32 Flat-Head Screws (17x) Front Mounting Brackets (2x) Rear of Rack Figure 15. Reattaching the Left and Right Front Mounting Bracket b. Using the ten #10-32 flat-head screws removed earlier, reattach the left front mounting bracket to the chassis (see Figure 15). Installing the Switch 25
![](/manual_guide/products/hewlettpackard-storageworks-264-hp-storageworks-core-switch-264-getting-started-general-reference-guide-4e71e98/33.png)
Installing the Switch
25
11.From the rear side of the rack, reattach the following items to the chassis:
a.
Using the seven #10-32 flat-head screws removed earlier, reattach the
right front mounting bracket to the chassis (see
Figure 15
).
Figure 15.
Reattaching the Left and Right Front Mounting Bracket
b.
Using the ten #10-32 flat-head screws removed earlier, reattach the
left front mounting bracket to the chassis (see
Figure 15
).
#10-32 Flat-Head
Screws (17x)
Front Mounting
Brackets (2x)
Rear of Rack