HP StorageWorks MSA1000 HP StorageWorks 2/8q Fibre Channel Switch Management V - Page 105

Message, User action, switch while the switch was running

Page 105 highlights

Switch Manager Table 35: Port Loopback test dialog box messages (Continued) Message No device detected in selected port yet. Test will not be run on empty port. Request to get admin privileges failed. Request to start loopback test failed. or Request to stop loopback test failed. or Request for loopback test results failed. or Request to reset loopback test results failed. Switch is currently unreachable. Unable to accurately report status of port test. The port selected for online port test must be online with active login. Timed out on response notifications. Test terminated. Unable to perform loopback test on port... ■ because port is not in diagnostic state. ■ because port is a donor port. ■ because there is already a port test in progress. User action Verify that a loopback device is attached to the port before starting loopback test. Verify that the port is online with an active login before starting the loopback test. Verify that another user is not currently modifying the switch configuration, using either the management application, or a telnet login, or any application, and then retry the operation. Verify that the user has permissions to modify the configuration on the switch, that the switch is reachable in the fabric, and that the fabric is reachable from the user's workstation, and then retry the configuration change. The application lost communications with the switch while the switch was running the loopback tests, and could not determine whether the tests completed. If the problem was temporary, restart the loopback tests. Verify that the port is online with an active login before starting the loopback test. The application lost communications with the switch while the switch was running the loopback tests, and could not determine whether the tests completed. If the problem was temporary, restart the loopback tests. Correct the error indicated, and then retry the loopback test. HP StorageWorks 2/8q Fibre Channel Switch Management User Guide 105

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172
  • 173
  • 174
  • 175
  • 176
  • 177
  • 178
  • 179
  • 180
  • 181
  • 182
  • 183
  • 184
  • 185
  • 186
  • 187
  • 188

Switch Manager
105
HP StorageWorks 2/8q Fibre Channel Switch Management User Guide
No device detected in selected port yet. Test
will not be run on empty port.
Verify that a loopback device is attached to the
port before starting loopback test.
Verify that the port is online with an active
login before starting the loopback test.
Request to get admin privileges failed.
Verify that another user is not currently
modifying the switch configuration, using
either the management application, or a telnet
login, or any application, and then retry the
operation.
Request to start loopback test failed.
or
Request to stop loopback test failed.
or
Request for loopback test results failed.
or
Request to reset loopback test results failed.
Verify that the user has permissions to modify
the configuration on the switch, that the switch
is reachable in the fabric, and that the fabric is
reachable from the user’s workstation, and
then retry the configuration change.
Switch is currently unreachable. Unable to
accurately report status of port test.
The application lost communications with the
switch while the switch was running the
loopback tests, and could not determine
whether the tests completed. If the problem
was temporary, restart the loopback tests.
The port selected for online port test must be
online with active login.
Verify that the port is online with an active
login before starting the loopback test.
Timed out on response notifications. Test
terminated.
The application lost communications with the
switch while the switch was running the
loopback tests, and could not determine
whether the tests completed. If the problem
was temporary, restart the loopback tests.
Unable to perform loopback test on port...
because port is not in diagnostic state.
because port is a donor port.
because there is already a port test in
progress.
Correct the error indicated, and then retry the
loopback test.
Table 35:
Port Loopback test dialog box messages (Continued)
Message
User action