IBM 2109 Service Guide - Page 40
Step 4. Locking the switch in the rack using the mounting earsinstalled in step 1
UPC - 087944519355
View all IBM 2109 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 40 highlights
Figure 10. Inserting slides into the rack rails SJ000049 2. Slide the switch back and forth on the rack several times to ensure that it moves freely. Move the switch partially forward and tighten the mounting screws on the rear brackets that were left finger tight. Step 4. Locking the switch in the rack using the mounting ears installed in step 1 1. Slide the switch fully back in the rack. 2. Using the remaining screws provided with the locking ears, lock the switch in the rack. This completes the rack mounting of the switch. To install GBICs, see "Installing GBICs" on page 25. To install the optional power supply, see "Installing the optional power supply". Installing the optional power supply Before installing the optional power supply, read the following danger notices. DANGER To prevent a possible electrical shock during an electrical storm, do not connect or disconnect cables or station protectors for communications lines, display stations, printers, or telephones. (72XXD003) DANGER Do not attempt to open the covers of the power supply. Power supplies are not serviceable and are replaced as a unit. (72XXD300) DANGER An electrical outlet that is not correctly wired could place hazardous voltage on metal parts of the system or the products that attach to the system. It is the customer's responsibility to ensure that the outlet is correctly wired and grounded to prevent an electrical shock. (72XXD201) 24 IBM SAN Fibre Channel Switch: 2109 Model S16 Installation and Service Guide