IBM 8671 Hardware Maintenance Manual - Page 55
Installation, guidelines, System, reliability, considerations
![]() |
UPC - 087944734307
View all IBM 8671 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 55 highlights
Chapter 4. Customer replaceable units This chapter provides instructions for adding options to your server. Some option-removal instructions are provided in case you need to remove one option to install another. Installation guidelines Before you begin to install options in your server, read the following information: v Become familiar with the safety and handling guidelines specified under "Handling static-sensitive devices" on page 46 and read the safety statements in "Safety information" on page 169. v You do not need to turn off the server to install or replace hot-swap power supplies, hot-swap drives, hot-swap fans, Active PCI (hot-plug) adapters, or hot-plug Universal Serial Bus (USB) devices. v The orange color on components and labels in your server identifies hot-swap or hot-plug component. You can install or remove hot-swap and hot-plug components while the system is running, provided that your system is configured to support this function. For complete details about installing or removing a hot-swap or hot-plug component, see the detailed information in this chapter. v The blue color on components and labels identifies touch points where you can grip a component, move a latch, and so on. v Make sure that you have an adequate number of properly grounded electrical outlets for your server, monitor, and any other options that you intend to install. v Back up all important data before you make changes to disk drives. v For a list of supported options for your server, go to http://www.ibm.com/pc/us/compat/ on the World Wide Web. System reliability considerations To help ensure proper cooling and system reliability, make sure that: v Each of the drive bays has either a drive or a filler panel installed. v Each of the power-supply bays has a power supply installed. v For tower models, make sure that there is at least 50 mm (2 inches) of ventilated space at the sides of the server and 100 mm (4 inches) at the front and rear of the server. For rack configurations, make sure that space is available around the server to enable the server cooling system to work properly. See the documentation that comes with the rack for additional information. v The server cover is in place during normal operation. v The air-baffle cover over the microprocessors remains closed during normal operation. v A removed hot-swap drive is replaced within 2 minutes of removal. v Cables for optional adapters are routed according to the instructions provided with the adapters. v A failed fan is replaced within 48 hours. v The server is turned off and the power cords are disconnected before you open the air-baffle cover. v The air-baffle assembly is always installed in the server except when you are installing or removing the components that are located under the air-baffle cover. © Copyright IBM Corp. 2002 45
![](/manual_guide/products/ibm-8671-hardware-maintenance-manual-61e0001/55.png)