Toshiba 50CT User Guide - Page 88

Tests and Diagnostics, Async Test, Infra_red wrap_around test

Page 88 highlights

3 Tests and Diagnostics 3.10 Async Test Subtest 03 Subtest 04 Subtest 05 Subtest 06 Subtest 07 Point to point (receive) This subtest is used with Subtest 02 described above. This subtest receives the data from the send side, then sends the received data. Interrupt test This subtest checks the Interrupt Request Level of IRQ 3, 4, and 5 from the send side. Infra_red wrap_around test This subtest checks the data send/receive function through the Infra_red port. Infra_red transmit mode This subtest checks the data send function through the Infra_red port. Infra_red receive mode This subtest checks the data receive function through the Infra_red port. Libretto 50CT/70CT Maintenance Manual 3-23

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172
  • 173
  • 174
  • 175
  • 176
  • 177
  • 178
  • 179
  • 180
  • 181
  • 182
  • 183
  • 184
  • 185
  • 186
  • 187
  • 188
  • 189
  • 190
  • 191
  • 192
  • 193
  • 194
  • 195
  • 196

3
Tests and Diagnostics
3.10
Async Test
Libretto 50CT/70CT Maintenance Manual
3-23
Subtest 03
Point to point (receive)
This subtest is used with Subtest 02 described above.
This subtest receives the
data from the send side, then sends the received data.
Subtest 04
Interrupt test
This subtest checks the Interrupt Request Level of IRQ 3, 4, and 5 from the
send side.
Subtest 05
Infra_red wrap_around test
This subtest checks the data send/receive function through the Infra_red port.
Subtest 06
Infra_red transmit mode
This subtest checks the data send function through the Infra_red port.
Subtest 07
Infra_red receive mode
This subtest checks the data receive function through the Infra_red port.