HP ML330 HP ProLiant ML330 Generation 3 Server Setup and Installation Guide - Page 55
shipping screws removed in step 3.
UPC - 613326960790
View all HP ML330 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 55 highlights
Hardware Options Installation 7. Install the hard drive: a. Slide the drive into the drive bay. b. Secure the drive with two screws on each side of the drive compartment. 8. Slide the drive compartment back into the chassis, and then install the three shipping screws removed in step 3. 9. Connect the data and power cables to the back of all devices. For specific cabling information, refer to "Cabling a Hard Drive" in this chapter. 10. Install the access panel and the front bezel. Refer to Chapter 2, "Server Operations." 4-12 HP ProLiant ML330 Generation 3 Server Setup and Installation Guide
Hardware Options Installation
7.
Install the hard drive:
a.
Slide the drive into the drive bay.
b.
Secure the drive with two screws on each side of the drive compartment.
8.
Slide the drive compartment back into the chassis, and then install the three
shipping screws removed in step 3.
9.
Connect the data and power cables to the back of all devices. For specific cabling
information, refer to “Cabling a Hard Drive” in this chapter.
10.
Install the access panel and the front bezel. Refer to Chapter 2, “Server
Operations.”
4-12
HP ProLiant ML330 Generation 3 Server Setup and Installation Guide