IBM 8676 Hardware Maintenance Manual - Page 71
Testing, chain
UPC - 087944770107
View all IBM 8676 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 71 highlights
4 IN OUT 3 IN OUT 2 IN OUT 1 IN OUT Video Mouse Keyboard Attention: Do not allow the pins of the C2T cable connectors to touch the server chassis. 3. Connect a C2T interconnect cable from the C2T (In) connector on the first server in the chain (server 1 in the illustration, typically the bottom server in the rack) to the C2T (Out) connector on the second server in the chain (server 2 in the illustration). The connectors on the ends of the cable are different and have different colors (black for Out and white for In) to prevent you from connecting them to the wrong connectors on the servers. Repeat this step until all the servers in the chain are connected. You can connect up to 42 servers in this manner. 4. Connect a C2T breakout cable to the C2T (Out) connector on the first server in the chain (server 1 in the illustration). 5. Connect the monitor, keyboard, and pointing device to the connectors on the C2T breakout cable. The keyboard and pointing-device connectors on the cable have icons to help you identify them. 6. Turn on the servers and test the chain, using the procedure in the following section. When you add, remove, or replace servers or change cables in the chain, it is possible for the select LED on more than one server to be lit. Press the select button on any server in the chain to turn off the select LEDs on all but the selected server. If you are using a flat-panel monitor, you might need to adjust the image lock on the monitor. Press the select button on one of the middle servers in the chain; then, adjust the image lock on the monitor. For more information about adjusting the image lock, see the documentation that comes with your monitor. Testing the C2T chain After cabling the C2T chain, test the monitor, keyboard, and pointing device to ensure that they work with each server in the chain. Complete the following steps to test the chain: 1. With the servers and the monitor turned on, press the select button on server 1 in the chain. 2. Verify that the monitor is working properly. 3. Use the pointing device (mouse) to start an application. Chapter 4. Customer replaceable units 61