Belkin F1DP216G User Manual - Page 10
INSTALLATION, Pre-Installation Guidelines, Avoiding general rack-mounting problems
View all Belkin F1DP216G manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 10 highlights
INSTALLATION Table of Contents sections 1 2 3 4 5 6 Pre-Installation Guidelines • Place cables away from fluorescent lights, air conditioners, and machines that are likely to generate electrical noise. • Place the Switch on a flat, clean, and dry surface. • The Switch is not intended for connection to exposed outdoor lines. • Ensure that the maximum distance between each computer and the Switch does not exceed 100 ft. for SIMs. Avoiding general rack-mounting problems Elevated operating ambient temperature The operating ambient temperature of the rack environment may be greater than the room ambient when installing into a closed or multiunit rack assembly. Install the equipment in an environment compatible with the maximum rated ambient temperature. Reduced airflow Install the equipment in a rack in such a way that the amount of airflow required for safe operation is not compromised. Leave a gap of at least 5cm/2 inches on each side of the Switch. Mechanical loading Mount the equipment in the rack in such a way that a hazardous condition is not achieved due to uneven mechanical loading. Circuit overloading When connecting the equipment to the supply circuit, consider the effect that overloading of circuits might have on over-current protection and supply wiring. Reliable electrical grounding of rack-mounted equipment should be maintained. Provide attention to supply connections other than direct connections to the branch circuit (e.g., use of power strips). OmniViewIP 5216K/5232K 7