Cisco IE-3000-8TC Installation Guide - Page 167

HP OpenView, B-1 to B-7 - 4tc power

Page 167 highlights

Index hazardous location (continued) grounding the switch B-17 installation guidelines B-5 installing compact flash memory card B-5 installing the switch B-26 running POST B-25 hazardous location warnings ambient temperature B-3 console cable B-3 DC power B-3 disconnecting the console cable B-3 disconnecting the power and relay connector B-3 disconnecting the wiring B-4 nonhazardous area for installation B-4 power and relay connector B-3, B-24 substitution of components B-4 HP OpenView 1-15 humidity A-2 I IE-3000-4TC switch, illustrated 1-3 IE-3000-8TC switch, illustrated 1-3 IEM-3000-8FM module, illustrated 1-4 IEM-3000-8TM module, illustrated 1-4 industrial environment warning B-4 installation assigning the IP address D-2 attach the power and relay connector 2-21, B-24 compact flash memory card B-13 DIN rail 2-24, B-27 grounding procedures 2-13 to 2-15, B-17 to B-19 guidelines 2-3, B-5 hazardous location B-1 package contents 2-5, B-7 POST 2-22, B-25 pre-installation information and guidelines 2-1 to 2-4, B-1 to B-7 rack-mount 2-29 to 2-31, B-33 to B-35 OL-13017-01 installation (continued) required clearance 2-4, B-7 SFP modules 2-38 to 2-40, B-43 to B-44 starting the terminal emulation software D-1 verifying switch operation 2-11 to 2-22, B-14 to B-25 wall 2-27, B-27 wiring the relays 2-33 to 2-35, B-38 to B-40 J jewelry removal warning 2-2, B-2 L LEDs 100BASE-FX ports 1-10 alarm 1-9 dual-purpose port 1-11 front panel 1-6 to 1-11 port status 1-10 POST results 3-1 power status 1-9 setup 1-8 system 1-9 troubleshooting with 3-2 lightning activity warning 2-2, B-2 link status troubleshooting 3-3 M management options 1-14 to 1-15 module configurations 2-6, B-9 connecting 2-8, B-11 mounting rack 2-29 to 2-31, B-33 to B-35 MT-RJ connector C-3 See also 100BASE-FX ports Cisco IE 3000 Switch Hardware Installation Guide IN-3

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170

Index
IN-3
Cisco IE 3000 Switch Hardware Installation Guide
OL-13017-01
hazardous location (continued)
grounding the switch
B-17
installation guidelines
B-5
installing compact flash memory card
B-5
installing the switch
B-26
running POST
B-25
hazardous location warnings
ambient temperature
B-3
console cable
B-3
DC power
B-3
disconnecting the console cable
B-3
disconnecting the power and relay connector
B-3
disconnecting the wiring
B-4
nonhazardous area for installation
B-4
power and relay connector
B-3, B-24
substitution of components
B-4
HP OpenView
1-15
humidity
A-2
I
IE-3000-4TC switch, illustrated
1-3
IE-3000-8TC switch, illustrated
1-3
IEM-3000-8FM module, illustrated
1-4
IEM-3000-8TM module, illustrated
1-4
industrial environment warning
B-4
installation
assigning the IP address
D-2
attach the power and relay connector
2-21, B-24
compact flash memory card
B-13
DIN rail
2-24, B-27
grounding procedures
2-13 to 2-15, B-17 to B-19
guidelines
2-3, B-5
hazardous location
B-1
package contents
2-5, B-7
POST
2-22, B-25
pre-installation information and guidelines
2-1 to 2-4,
B-1 to B-7
rack-mount
2-29 to 2-31, B-33 to B-35
installation (continued)
required clearance
2-4, B-7
SFP modules
2-38 to 2-40, B-43 to B-44
starting the terminal emulation software
D-1
verifying switch operation
2-11 to 2-22, B-14 to B-25
wall
2-27, B-27
wiring the relays
2-33 to 2-35, B-38 to B-40
J
jewelry removal warning
2-2, B-2
L
LEDs
100BASE-FX ports
1-10
alarm
1-9
dual-purpose port
1-11
front panel
1-6 to 1-11
port status
1-10
POST results
3-1
power status
1-9
setup
1-8
system
1-9
troubleshooting with
3-2
lightning activity warning
2-2, B-2
link status troubleshooting
3-3
M
management options
1-14 to 1-15
module
configurations
2-6, B-9
connecting
2-8, B-11
mounting
rack
2-29 to 2-31, B-33 to B-35
MT-RJ connector
C-3
See also 100BASE-FX ports