Intel SR1625UR Service Guide - Page 96
Removing and Installing the Server Board, Removing the Server Board
![]() |
View all Intel SR1625UR manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 96 highlights
A B TP02258 Figure 65. Removing the RAID Battery Backup Unit 6. Install the power distribution board cover. For instructions, see "Replacing the Power Distribution Module" on page 84. 7. Install the processor air duct. For instructions, see "Installing the Processor Air Duct" on page 49. 8. Install the PCI riser assembly into the server system. For instructions, see "Installing the PCI Riser Assembly" on page 44. Removing and Installing the Server Board Removing the Server Board To remove the server board, follow these steps: 1. If installed, remove the PCI riser assembly. For instructions, see "Removing the PCI Riser Assembly" on page 43. 2. If installed, remove the processor air duct. For instructions, see "Removing the Processor Air Duct" on page 48. 3. Disconnect the SATA cables from the server board, if applicable. 4. If installed, remove the bridge board. Remove the bridge board. For instructions, see step 4 in "Removing the Midplane Board" on page 70. 5. Remove the system fan assembly. For instructions, see "Removing the System Fan Assembly" on page 91. 6. Disconnect all power cables coming from the power supply to the server board. 78 Intel® Server System SR1625UR Service Guide
![](/manual_guide/products/intel-sr1625ur-service-guide-02b4d1e/96.png)