Cisco 6509 Installation Guide - Page 191

Removing and Installing the Power Entry Modules PEMs

Page 191 highlights

Chapter 4 Removal and Replacement Procedures Removing and Installing the Power Entry Modules (PEMs) Step 16 Step 17 Turn the power switch to the On (|) position on the power supply. Turning on the power switch also engages a pawl that locks the power supply in the chassis. Verify the power supply operation by ensuring that the power supply front panel LEDs are in the following states: • INPUT OK LED is green • FAN OK LED is green • OUTPUT FAIL LED is not lit If the LEDs indicate a power problem, see the "Identifying Startup Problems" section on page E-3. Removing and Installing the Power Entry Modules (PEMs) This section describes how to remove and install the PEMs for the Catalyst 6503 and Catalyst 6503-E switches. There are three PEM models: 950 W AC-input PEM-PEM-15A-AC 1400 W AC-input PEM-PEM-20A-AC+ 950 W DC-input PEM-PEM-DC/3 Note The PEM is used on the Catalyst 6503 and Catalyst 6503-E switches only. The PEM provides an input power connection on the front of the chassis to connect the site power source to the power supply. In addition to providing an input power connection, the PEM also has an illuminated power switch (AC-input only), current protection, surge and EMI suppression, and filtering functions. See Figure 4-40 for the location of the PEM; see Figure 4-41 for the location of the power supplies. The PEM on the left (PEM 1) connects the site power source to power supply 1; the PEM on the right (PEM 2) connects the site power source to power supply 2. Figure 4-40 Catalyst 6503-PEM Location PEM 1 PEM 2 OL-5781-04 63191 WS-X6K-SUP2-2GE STATUS SYSTEMCONSOLPEWR MGRMETSET SUPERVISOR2 CONSOLE CONSOLE PORT MODE PCMCIA EJECT OSM-4OC12 POS-SI 1 STATUS 2 4 PORT OC-12 POS SM IR LINK 1 OSM-4OC12 POS-SI 1 STATUS 2 4 PORT OC-12 POS SM IR LINK 1 2 LINK 2 LINK 3 4 LINK 3 4 LINK RESET ACTIVE TX RX CARRAILEARRM RX TX PORT 1 ACTIVE TX RX CARRAILEARRM RX TX PORT 2 3 4 LINK 3 4 LINK RESET ACTIVE TX RX CARRAILEARRM RX TX PORT 1 ACTIVE TX RX CARRAILEARRM RX TX PORT 2 Switch 100% Load PORT 1 1% ACTIVE TX RX CARRAILEARRM RX TX PORT 3 LINK ACTIVE TX RX CARRAILEARRM PORT 2 LINK RX TX PORT4 ACTIVE TX RX CARRAILEARRM RX TX PORT 3 ACTIVE TX RX CARRAILEARRM RX TX PORT4 Catalyst 6500 Series Switches Installation Guide 4-51

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172
  • 173
  • 174
  • 175
  • 176
  • 177
  • 178
  • 179
  • 180
  • 181
  • 182
  • 183
  • 184
  • 185
  • 186
  • 187
  • 188
  • 189
  • 190
  • 191
  • 192
  • 193
  • 194
  • 195
  • 196
  • 197
  • 198
  • 199
  • 200
  • 201
  • 202
  • 203
  • 204
  • 205
  • 206
  • 207
  • 208
  • 209
  • 210
  • 211
  • 212
  • 213
  • 214
  • 215
  • 216
  • 217
  • 218
  • 219
  • 220
  • 221
  • 222
  • 223
  • 224
  • 225
  • 226
  • 227
  • 228
  • 229
  • 230
  • 231
  • 232
  • 233
  • 234
  • 235
  • 236
  • 237
  • 238
  • 239
  • 240
  • 241
  • 242
  • 243
  • 244
  • 245
  • 246
  • 247
  • 248
  • 249
  • 250
  • 251
  • 252
  • 253
  • 254
  • 255
  • 256
  • 257
  • 258
  • 259
  • 260
  • 261
  • 262
  • 263
  • 264
  • 265
  • 266
  • 267
  • 268
  • 269
  • 270
  • 271
  • 272
  • 273
  • 274
  • 275
  • 276
  • 277
  • 278
  • 279
  • 280
  • 281
  • 282
  • 283
  • 284
  • 285
  • 286
  • 287
  • 288
  • 289
  • 290
  • 291
  • 292
  • 293
  • 294
  • 295
  • 296
  • 297
  • 298
  • 299
  • 300
  • 301
  • 302
  • 303
  • 304
  • 305
  • 306
  • 307
  • 308
  • 309
  • 310
  • 311
  • 312
  • 313
  • 314
  • 315
  • 316
  • 317
  • 318
  • 319
  • 320
  • 321
  • 322
  • 323
  • 324
  • 325
  • 326
  • 327
  • 328
  • 329
  • 330
  • 331
  • 332
  • 333
  • 334
  • 335
  • 336

4-51
Catalyst 6500 Series Switches Installation Guide
OL-5781-04
Chapter 4
Removal and Replacement Procedures
Removing and Installing the Power Entry Modules (PEMs)
Step 16
Turn the power switch to the On (|) position on the power supply. Turning on the power switch also
engages a pawl that locks the power supply in the chassis.
Step 17
Verify the power supply operation by ensuring that the power supply front panel LEDs are in the
following states:
INPUT OK LED is green
FAN OK LED is green
OUTPUT FAIL LED is not lit
If the LEDs indicate a power problem, see the
“Identifying Startup Problems” section on page E-3
.
Removing and Installing the Power Entry Modules (PEMs)
This section describes how to remove and install the PEMs for the Catalyst 6503 and Catalyst 6503-E
switches. There are three PEM models:
950 W AC-input PEM—PEM-15A-AC
1400 W AC-input PEM—PEM-20A-AC+
950 W DC-input PEM—PEM-DC/3
Note
The PEM is used on the Catalyst 6503 and Catalyst 6503-E switches only.
The PEM provides an input power connection on the front of the chassis to connect the site power source
to the power supply. In addition to providing an input power connection, the PEM also has an illuminated
power switch (AC-input only), current protection, surge and EMI suppression, and filtering functions.
See
Figure 4-40
for the location of the PEM; see
Figure 4-41
for the location of the power supplies. The
PEM on the left (PEM 1) connects the site power source to power supply 1; the PEM on the right (PEM
2) connects the site power source to power supply 2.
Figure 4-40
Catalyst 6503—PEM Location
SUPERVISOR2
WS-X6K-SUP2-2GE
STATUS
SYSTEM
CONSOLE
PWR MGMT
RESET
CONSOLE
CONSOLE
PORT
MODE
PCMCIA
EJECT
PORT 1
PORT 2
Switch
Load
100%
1%
LINK
LINK
OSM-4OC12 POS-SI
4 PORT OC-12 POS SM IR
STATUS
1
1
2
2
3
3
4
4
RESET
LINK
LINK
LINK
LINK
CARRIER
ALARM
CARRIER
ALARM
CARRIER
ALARM
CARRIER
ALARM
ACTIVE
TX
RX
TX
PORT 1
RX
ACTIVE
TX
RX
TX
PORT 2
RX
ACTIVE
TX
RX
TX
PORT 3
RX
ACTIVE
TX
RX
TX
PORT4
RX
OSM-4OC12 POS-SI
4 PORT OC-12 POS SM IR
STATUS
1
1
2
2
3
3
4
4
RESET
LINK
LINK
LINK
LINK
CARRIER
ALARM
CARRIER
ALARM
CARRIER
ALARM
CARRIER
ALARM
ACTIVE
TX
RX
TX
PORT 1
RX
ACTIVE
TX
RX
TX
PORT 2
RX
ACTIVE
TX
RX
TX
PORT 3
RX
ACTIVE
TX
RX
TX
PORT4
RX
63191
PEM 1
PEM 2